Data Centers in McLennan County
Under constructionMcLennan County hosts 1 Comptroller-certified site and 11 TDLR construction filings Projects touch 3 school districts (La Vega Independent School District, Midway Independent School District, and Waco Independent School District). U.S. House seats in the record: District 17. Free brief: power, water, and politics from those records. Annual unlocks school-district tax-base fields (top taxpayers, M&O, per-pupil) and who governs a specific pin on the map.
Power
McLennan County power records from Comptroller certificates and TDLR filings. Certified names in the public record include West Texas Data Center. TDLR project names include PNC Bank ADA Remediation Design - E766 Bellmead, Fidelity Manufacturing Plant 3A, Casa Compadres, Fidelity Bank - Highway 84, Amazon Fulfillment Center AUS3 - QTX2 Ground PADDC, Emergency Generator and Anti-Ligature Adaptation, and 5 more. Fidelity Bank - Highway 84 lists an estimated cost of $5,000,000. Nearby ERCOT queue capacity summarized by fuel includes 1,679 MW Other; 887 MW Solar; 594 MW Wind. Approximate sites stay county-level when geocode quality does not support a precise city.
Water
Water at project locations (not whole-county coverage). Known sites name SOUTHERN TRINITY GROUNDWATER CONSERVATION DISTRICT. District boundaries do not follow county lines.
Politics
McLennan County siting records (not a full voter guide). School districts appearing on certified or filed sites include La Vega Independent School District, Midway Independent School District, and Waco Independent School District. U.S. House districts in the record: District 17 — Pete Sessions (R). State House: District 13 — Angelia Orr (R); District 56 — Pat Curry (R). State Senate: District 22 — Brian Birdwell (R). Tax-base fields (top taxpayers, M&O, per-pupil) stay annual-only. Pin-level “who governs this parcel” is annual on the map.
Loading map…
Power records
Full power records (public feeds)
- Certified site
- West Texas Data Center
- Occupant
- WTDM OZB LLC
- Certificate type
- qualifying
- TDLR project
- PNC Bank ADA Remediation Design - E766 Bellmead
- Facility
- E766 Bellmead
- Owner
- Compass Bank
- Estimated cost
- $140,000
- Square footage
- 3,080
- Type of work
- Renovation/Alteration
- Scope
- The improvements intend to bring the facility exterior accessible parking/access aisle and accessible pedestrian paths into compliance with current ADA standards.
- Status
- Project Closed
- Design firm
- (412) 269-6300
- Location
- 4010 Bellmead Drive, McLennan County, Texas
- County
- McLennan
- TDLR project
- Fidelity Manufacturing Plant 3A
- Facility
- Fidelity Manufacturing Plant 3A
- Owner
- RLP S. Main, LLC
- Estimated cost
- $2,000,000
- Square footage
- 193,028
- Type of work
- Renovation/Alteration
- Scope
- Converting approx. 194,000 SF of warehouse space into industrial fabrication spaces, warehouse space and office space.
- Status
- Project Registered
- Design firm
- (972) 759-1400
- Location
- 2055 S. Main Street Unit #2, McLennan County, Texas
- County
- McLennan
- TDLR project
- Casa Compadres
- Facility
- Fidelity Plaza ste 103/102
- Owner
- Tony Pena/Trident Construction Services
- Estimated cost
- $150,000
- Square footage
- 4,657
- Type of work
- Renovation/Alteration
- Scope
- install appliances and remove pony walls
- Status
- Project Registered
- Design firm
- 254-498-6431
- Location
- 5102 N. 19th Street ste 103/102, McLennan County, Texas
- County
- McLennan
- TDLR project
- Fidelity Bank - Highway 84
- Facility
- Fidelity Bank of Texas
- Owner
- Fidelity Bank of Texas
- Estimated cost
- $5,000,000
- Square footage
- 10,088
- Type of work
- New Construction
- Scope
- New construction of a bank building of approximately 10,088 square feet
- Status
- Review Complete
- Design firm
- (254) 776-8380
- Location
- 27325 W. Hwy. 84, McLennan County, Texas
- County
- McLennan
- TDLR project
- Amazon Fulfillment Center AUS3 - QTX2 Ground PADDC
- Facility
- Amazon Fulfillment Center AUS3
- Owner
- USRE DIANA LLC
- Estimated cost
- $890,000
- Square footage
- 9,400
- Type of work
- New Construction
- Scope
- New Construction (located in parking lot of existing AUS3 site). Perimeter fencing around 2 modular structures. Striping on existing pavement within fenced area for accessible circulation and launch / landing pads for delivery system
- Status
- Inspection Complete
- Location
- 2000 Exchange Pkwy, Waco, TX 76712, McLennan County, Texas
- County
- McLennan
- TDLR project
- Emergency Generator and Anti-Ligature Adaptation
- Facility
- Waco Center for Youth
- Owner
- Texas Health and Human Services
- Estimated cost
- $180,000
- Square footage
- 330
- Type of work
- Renovation/Alteration
- Scope
- Renovating toilets in Building 517 to meet TAS and make anti-ligature for the patients. Adding anti--ligature door hardware to three doors in building 501.
- Status
- Project Closed
- Design firm
- 832-659-5389
- Location
- 3501 N 19th Street, McLennan County, Texas
- County
- McLennan
- TDLR project
- Cottonwood Creek Market - Tract 3
- Facility
- Cottonwood Creek Market - Tract 3
- Owner
- NewQuest Properties
- Estimated cost
- $1,200,000
- Square footage
- 9,800
- Type of work
- New Construction
- Scope
- shell building
- Status
- Project Closed
- Design firm
- (713) 781-5262
- Location
- 2424 Creekview Dr., McLennan County, Texas
- County
- McLennan
- TDLR project
- Amazon - AUS3 - Alteration
- Facility
- Amazon - AUS3 - Waco, TX
- Owner
- USRE Diana LLC
- Estimated cost
- $50,000
- Square footage
- 3,967
- Type of work
- Renovation/Alteration
- Scope
- 3967 SF. Scope includes: cutting in a new slider door into exterior wall, adding an awning and light above that slider door. Inside chain link fencing, turnstile, interior gates, and some low voltage card readers.
- Status
- Project Closed
- Design firm
- (937) 435-8584
- Location
- 2000 Exchange Parkway, McLennan County, Texas
- County
- McLennan
- TDLR project
- Baylor Production Studio
- Facility
- McLane Stadium
- Owner
- Baylor University
- Estimated cost
- $2,000,000
- Square footage
- 8,000
- Type of work
- Renovation/Alteration
- Scope
- Remodel of 8,000 SF from existing open space and ticketing offices to a production studio with enclosed and open office space, video production facilities, equipment checkout, and server room.
- Status
- Project Closed
- Design firm
- 816-455-3961
- Location
- 1001 S M.L.K. Jr Blvd, McLennan County, Texas
- County
- McLennan
- TDLR project
- Project Justice
- Facility
- Project Justice
- Owner
- Amazon.com Services LLC
- Estimated cost
- $2,400,000
- Square footage
- 89,112
- Type of work
- New Construction
- Scope
- New Concrete wall panel single story fully sprinklered building (S-1 OCC.). Drive through Van loading canopy (S-2 OCC.) with support office area (B OCC.), Break room (A-2 OCC. ) and Training room (A-3 OCC.)
- Status
- Inspection Complete
- Location
- John Bowden Parkway and I35 Frontage Road, McLennan County, Texas
- County
- McLennan
- TDLR project
- RONI'S MAC BAR
- Facility
- COTTONWOOD CREEK MARKET - TRACT 3
- Owner
- COTTONWOOD CREEK - PARTNERSHIP 152B LP
- Estimated cost
- $266,000
- Square footage
- 2,462
- Type of work
- New Construction
- Scope
- 1st TIME TENANT FINISH OUT OF AN EXISTING SPACE TO INCLUDE A DINING AREA, FRONT OF HOUSE PREP/SALES, PREP AREA, OFFICE, RESTROOMS AND ELEC./MECH. CLOSETS.
- Status
- Project Closed
- Design firm
- (254) 722-5930
- Location
- 2424 CREEKVIEW DRIVE SUITE 110, McLennan County, Texas
- County
- McLennan
- Queue capacity (Gas)
- 223.36 MW
- Queue capacity (Other)
- 1,679.06 MW
- Queue capacity (Solar)
- 886.94 MW
- Queue capacity (Wind)
- 594.4 MW
- Approximate location — county level.
Water records
Full water records (public feeds)
- Groundwater conservation district
- SOUTHERN TRINITY GROUNDWATER CONSERVATION DISTRICT
Politics records
- School district
- La Vega Independent School District
- Students
- 3,120
- Assessed value
- $1,905,741,614
- School district
- Midway Independent School District
- Students
- 8,849
- Assessed value
- $229,472,538
- School district
- Waco Independent School District
- Students
- 13,517
- Assessed value
- $11,335,643,110
- State House
- District 13 — Angelia Orr (R)
- State House
- District 56 — Pat Curry (R)
- State Senate
- District 22 — Brian Birdwell (R)
- Congressional
- District 17 — Pete Sessions (R)
- Top taxpayers
- Subscribe to see
- M&O collections
- Subscribe to see
- Per-student spend
- Subscribe to see
- Median household income
- Subscribe to see
- Top industries
- Subscribe to see
- Population
- Subscribe to see
- School-district economics (annual) are shown for Waco Independent School District (most cert sites); 2 other districts on record.
Sources: Texas Geographic Information Office · Texas Comptroller · Texas Department of Licensing and Regulation · Texas Water Development Board · ERCOT
Frequently asked questions
How many data center projects does McLennan County have in public records?
McLennan County has 1 Comptroller-certified data-center site and 11 TDLR construction filings in the public feeds this atlas tracks.
What is the largest TDLR data-center filing cost on record in McLennan County?
Fidelity Bank - Highway 84 lists an estimated cost of $5,000,000 in TDLR public records for McLennan County.
Which groundwater districts appear at known McLennan County data-center sites?
Public records for known project locations name SOUTHERN TRINITY GROUNDWATER CONSERVATION DISTRICT. District boundaries do not follow county lines, so this is point-derived, not whole-county coverage.
Annual subscriber data
McLennan County — locked fields
The free brief and map above name public projects and county-level jurisdictions. Annual access unlocks who governs a specific pin on the map and fills the tax-base fields below.
School district
- Top taxpayersAnnual
- M&O collectionsAnnual
- Per-student spendAnnual
County
- Median household incomeAnnual
- Top industriesAnnual
- PopulationAnnual