Data Centers in Bexar County

Under construction

Bexar County hosts 50 TDLR data-center construction filings Projects touch 3 school districts (East Central Independent School District, Northside Independent School District, and San Antonio Independent School District). U.S. House seats in the record: District 20, District 23, District 28, and District 35. Free brief: power, water, and politics from those records. Annual unlocks school-district tax-base fields (top taxpayers, M&O, per-pupil) and who governs a specific pin on the map.

Power

Bexar County power records from Comptroller certificates and TDLR filings. TDLR project names include SAT 23 Data Hall 5 Fit Out, Vantage Data Centers TX21 Tenant Fit-out, ALE061 - Room 2, COPT Potranco - TI, SAT14 - Phase 3, EX West Green Data Center, and 44 more. TX12 TFO lists an estimated cost of $448,000,000. Nearby ERCOT queue capacity summarized by fuel includes 5,436 MW Other; 152 MW Solar; 35 MW Gas. Approximate sites stay county-level when geocode quality does not support a precise city.

Water

Water at project locations (not whole-county coverage). Known sites name EDWARDS AQUIFER AUTHORITY. District boundaries do not follow county lines.

Politics

Bexar County siting records (not a full voter guide). School districts appearing on certified or filed sites include East Central Independent School District, Northside Independent School District, and San Antonio Independent School District. U.S. House districts in the record: District 20 — Joaquin Castro (D); District 23 — Tony Gonzales (R); District 28 — Henry Cuellar (D); District 35 — Greg Casar (D). State House: District 116 — Trey Martinez Fischer (D); District 117 — Philip Cortez (D); District 118 — John Lujan (R); District 122 — Mark Dorazio (R); District 124 — Josey Garcia (D). State Senate: District 19 — Roland Gutierrez (D); District 21 — Judith Zaffirini (D); District 26 — Jose Menendez (D). Commissioners court agendas run via CivicPlus AgendaCenter (Every other Tuesday 9:00 a.m. — Commissioners Courtroom, Bexar County Courthouse (Room 2.01), 100 Dolorosa, San Antonio). Tax-base fields (top taxpayers, M&O, per-pupil) stay annual-only. Pin-level “who governs this parcel” is annual on the map.

Loading map…

Power records

Full power records (public feeds)
TDLR project
SAT 23 Data Hall 5 Fit Out
Facility
SAT B1
Owner
Stream Data Centers
Estimated cost
$10,000,000
Square footage
24,000
Type of work
Renovation/Alteration
Scope
24,000 SF tenant fit-out of data hall space.
Status
Review Complete
Design firm
(214) 757-1613
Location
11203 MILITARY DR. W SAN ANTONIO, TEXAS, Bexar County, Texas
County
Bexar
TDLR project
Vantage Data Centers TX21 Tenant Fit-out
Facility
VDC TX21
Owner
VANTAGE DATA CENTERS TX2 LLC
Estimated cost
$135,000,000
Square footage
162,785
Type of work
Renovation/Alteration
Scope
Tenant Fit Out - 162,785 SF
Status
Project Registered
Design firm
614-607-2088
Location
5207 ROGERS ROAD, Bexar County, Texas
County
Bexar
TDLR project
ALE061 - Room 2
Facility
ALE061 - Room 2
Owner
Amazon Data Services, Inc.
Estimated cost
$10,640,000
Square footage
17,900
Type of work
Renovation/Alteration
Scope
Interior fit out of data hall
Status
Project Registered
Design firm
(303) 595-8585
Location
12807 Donop Road, Bexar County, Texas
County
Bexar
TDLR project
COPT Potranco - TI
Facility
Building B
Owner
COPT SAN ANTONIO LP
Estimated cost
$50,000,000
Square footage
141,081
Type of work
New Construction
Scope
Tenant finish out work at an existing two-story core and shell building for a single tenant computer data center.
Status
Project Registered
Design firm
(713) 844-0000
Location
1535 NW Crossroads, Bexar County, Texas
County
Bexar
TDLR project
SAT14 - Phase 3
Facility
SAT14 Data Center
Owner
Microsoft
Estimated cost
$31,300,000
Square footage
60,000
Type of work
New Construction
Scope
Finish-out / fit-out of admin area and one data center colo within shell facility.
Status
Inspection Complete
Design firm
(512) 472-6721
Location
3545 Wiseman Boulevard, Bexar County, Texas
County
Bexar
TDLR project
EX West Green Data Center
Facility
Ex West New MMR's
Owner
COPT San Antonio II, LP
Estimated cost
$15,000,000
Square footage
3,200
Type of work
New Construction
Scope
The addition of two 800 sf Meet Me Room (MMR) Buildings to the existing EX West Green Data Center project. The scope includes support MEP work and equipment as well as site modifications. Total new square footage- 1600 sf
Status
Review Complete
Design firm
(512) 472-6721
Location
1050 Democracy, Bexar County, Texas
County
Bexar
TDLR project
BITTER BLUE Romp 03 and 04 Fit-Out
Facility
Rockfish
Owner
Amazon Data Services Inc
Estimated cost
$18,620,000
Square footage
33,411
Type of work
Renovation/Alteration
Scope
Interior fit-out of an existing data center building. Work includes construction of interior partitions, ceilings, finishes, mechanical, electrical, plumbing, and fire protection systems for the new data hall and its mechanical and electrical spaces.
Status
Review Complete
Design firm
(303) 595-8585
Location
12807 Donop Road, Bexar County, Texas
County
Bexar
TDLR project
SAT40
Facility
SAT40 Data Center
Owner
Microsoft
Estimated cost
$175,900,000
Square footage
153,227
Type of work
New Construction
Scope
Site and building shell data center including administrative components and data center.
Status
Review Complete
Design firm
(512) 472-6721
Location
15000 Lambda Drive, Bexar County, Texas
County
Bexar
TDLR project
CyrusOne SAT 8 & 9
Facility
SAT 8 & 9
Owner
CyrusOne
Estimated cost
$15,000,000
Square footage
279,730
Type of work
New Construction
Scope
This project is a two-story data center and office building at approximate 279,730 sf gross area. The construction will include admin areas, 4 data halls with electrical and mechanical rooms to support the critical load of the building.
Status
Project Registered
Location
14815 Omicron Drive, Bexar County, Texas
County
Bexar
TDLR project
American Tower Data Center
Facility
American Tower Data Center - Highway 90
Owner
American Towers, LP
Estimated cost
$15,000,000
Square footage
7,255
Type of work
New Construction
Scope
Construction of an electronic data storage center on a vacant lot adjacent to existing cellular communications facility. Day-to-day operations of the storage center will be separate (but related) to the cellular communications facility.
Status
Review Complete
Location
5436 New Highway 90 West, Bexar County, Texas
County
Bexar
TDLR project
Microsoft SN7 Phase 2
Facility
Microsoft SN7 Colo 2 (full build out) & Colo 3 (shell & in)
Owner
Microsoft (Andrew Taylor)
Estimated cost
$77,000,000
Square footage
104,837
Type of work
New Construction
Scope
Pre-Engineered Metal Building Connector corridor, Colo 2 full build out, Colo 3 shell and interior, equipment service yard with equipment for Colo 2, and acoustical fence enclosure for service yard.
Status
Project Closed
Design firm
(214) 679-9505
Location
5200 Rogers Road, Bexar County, Texas
County
Bexar
TDLR project
Cyrusone - SAT TRP USAA
Facility
Cyrusone - SAT TRP USAA
Owner
Cyrusone (Danny Cowser)
Estimated cost
$64,000,000
Square footage
206,310
Type of work
New Construction
Scope
New construction building, x SF of two-story data center, x SF of office, a portion of which is two-story.
Status
Project Closed
Design firm
(214) 757-1622
Location
Zeta Drive, Bexar County, Texas
County
Bexar
TDLR project
AWS Rockfish
Facility
ALE060 - TI
Owner
Amazon Data Services, Inc.
Estimated cost
$31,000,000
Square footage
109,600
Type of work
New Construction
Scope
Fit-out of a data center
Status
Review Complete
Design firm
(303) 595-8585
Location
7400 Potranco Road, Bexar County, Texas
County
Bexar
TDLR project
Lavender Hill
Facility
Building B
Owner
AMAZON DATA SERVICES INC
Estimated cost
$65,000,000
Square footage
93,145
Type of work
New Construction
Scope
A new construction of a two-story building for a single tenant computer data center.
Status
Review Complete
Design firm
(713) 844-0000
Location
2200 State HWY 211, Bexar County, Texas
County
Bexar
TDLR project
SAT46
Facility
SAT46
Owner
Microsoft
Estimated cost
$140,000,000
Square footage
79,385
Type of work
New Construction
Scope
New data center building and associated site work on existing Texas Research Park campus
Status
Project Closed
Design firm
919-880-7116
Location
15000 Block Lambda Dr, Bexar County, Texas
County
Bexar
TDLR project
TX12 TFO
Facility
TX12
Owner
VANTAGE DATA CENTERS TX1 LLC
Estimated cost
$448,000,000
Square footage
174,812
Type of work
New Construction
Scope
TX12 Opel Fit-up includes the tenant build out of 96MW of data modules and all associated office and storage areas.
Status
Project Registered
Design firm
1-312-633-2900
Location
17420 Omicron Dr., Bexar County, Texas
County
Bexar
TDLR project
SAT14 - Phase 2
Facility
SAT14 Data Center
Owner
Microsoft
Estimated cost
$26,800,000
Square footage
46,000
Type of work
New Construction
Scope
Finish-out / fit-out of one colo of data center within shell facility.
Status
Inspection Complete
Design firm
(512) 472-6721
Location
3545 Wiseman Boulevard, Bexar County, Texas
County
Bexar
TDLR project
SAT 23 Data Hall 2 Fit Out
Facility
SAT B1
Owner
Stream Data Centers
Estimated cost
$10,000,000
Square footage
24,000
Type of work
Renovation/Alteration
Scope
24,000 SF tenant fit-out of data hall space.
Status
Review Complete
Design firm
(214) 757-1613
Location
11203 MILITARY DR. W SAN ANTONIO, TEXAS, Bexar County, Texas
County
Bexar
TDLR project
Bitter Blue Romp04 Liquid Cooling
Facility
Building A
Owner
AMAZON DATA SERVICES INC
Estimated cost
$6,000,000
Square footage
8,000
Type of work
Renovation/Alteration
Scope
Interior alteration of an existing data center building to incorporate liquid cooling equipment for portion of the building interior.
Status
Review Complete
Design firm
(303) 595-8585
Location
12807 Donop Road, Bexar County, Texas
County
Bexar
TDLR project
BITTER BLUE
Facility
Building B
Owner
AMAZON DATA SERVICES INC
Estimated cost
$65,000,000
Square footage
119,407
Type of work
New Construction
Scope
A new construction of a two-story building for a single tenant computer data center.
Status
Review Complete
Design firm
(713) 844-0000
Location
12807 Donop Road, Bexar County, Texas
County
Bexar
TDLR project
COPT Potranco - Core Shell
Facility
Building B
Owner
COPT SAN ANTONIO LP
Estimated cost
$25,000,000
Square footage
141,979
Type of work
New Construction
Scope
A new construction of a two-story core and shell building for a future single tenant computer data center.
Status
Review Complete
Design firm
(713) 844-0000
Location
1535 NW Crossroads, Bexar County, Texas
County
Bexar
TDLR project
EX West Green Data Center
Facility
EX West Green Data Center
Owner
COPT San Antonio II, L.P.
Estimated cost
$7,400,000
Square footage
1,600
Type of work
New Construction
Scope
The addition of two, 800 sf Meet Me Room (MMR) buildings to the existing site of the EX West Green Data Center Project. The scope includes supporting MEP work and equipment, as well as related site modifications.
Status
Project Closed
Design firm
(512) 660-4572
Location
1050 Democracy, Bexar County, Texas
County
Bexar
TDLR project
Lowe's UPS Modernization
Facility
Data Center
Owner
Lowe's
Estimated cost
$13,000,000
Square footage
10,418
Type of work
Renovation/Alteration
Scope
Electrical Equipment replacement (UPS), required modification to Electrical, Mechanical, Architectural, and Fire Protection within affected rooms. Total area affected by project is 10,418 sqft.
Status
Review Complete
Design firm
210-660-1678
Location
10045 Rogers Run, Bexar County, Texas
County
Bexar
TDLR project
SAT14 - Phase 4
Facility
SAT14 Data Center
Owner
Microsoft
Estimated cost
$27,200,000
Square footage
46,000
Type of work
New Construction
Scope
Finish-out / fit-out of one colo of data center within shell facility.
Status
Inspection Complete
Design firm
(512) 472-6721
Location
3545 Wiseman Boulevard, Bexar County, Texas
County
Bexar
TDLR project
AWS Rockfish
Facility
ALE062
Owner
Amazon Data Services, Inc.
Estimated cost
$55,950,000
Square footage
109,600
Type of work
New Construction
Scope
New construction and fit-out of a data center
Status
Review Complete
Design firm
(303) 595-8585
Location
TX-211 & Potranco Road, Bexar County, Texas
County
Bexar
TDLR project
SAT 23 Data Hall 3 Fit Out
Facility
SAT B1
Owner
Stream Data Centers
Estimated cost
$10,000,000
Square footage
24,000
Type of work
Renovation/Alteration
Scope
24,000 SF tenant fit-out of data hall space.
Status
Review Complete
Design firm
(214) 757-1613
Location
11203 MILITARY DR. W SAN ANTONIO, TEXAS, Bexar County, Texas
County
Bexar
TDLR project
ALE062 - Room 2
Facility
ALE062 - Room 2
Owner
Amazon Data Services, Inc
Estimated cost
$10,640,000
Square footage
17,900
Type of work
Renovation/Alteration
Scope
Interior fit out of a data hall
Status
Project Registered
Design firm
(303) 595-8585
Location
2200 State Hwy. 211, Bexar County, Texas
County
Bexar
TDLR project
Cyrusone SAT V-Level 02 Fit-out
Facility
Cyrusone SAT V TRP1
Owner
CyrusOne
Estimated cost
$15,000,000
Square footage
98,480
Type of work
Renovation/Alteration
Scope
Upfit of level 2 shell space of existing bldg; 48,000 sf of which is data center storage & associated support space, along with 2,700 sf of office space.
Status
Project Closed
Design firm
(214) 757-1622
Location
14719 Omicron Dr, Bexar County, Texas
County
Bexar
TDLR project
AWS Rockfish
Facility
ALE060 - CS
Owner
Corporate Office Properties Trust
Estimated cost
$24,950,000
Square footage
109,600
Type of work
New Construction
Scope
Core and shell (warehouse) for future data center fit-out
Status
Project Closed
Design firm
(303) 595-8585
Location
7400 Potranco Road, Bexar County, Texas
County
Bexar
TDLR project
EX West Green Data Center Phase 2
Facility
EX West Green Data Center
Owner
COPT San Antonio II, LP
Estimated cost
$279,988,945
Square footage
88,980
Type of work
New Construction
Scope
Phase 2 of project on 28.05 acre greenfield site. Includes small one story Ops Office Building, storage containers, modular data center containers (MDCs; equipment) with supporting elec and mech equipment, exterior yards, and covered walkways.
Status
Project Closed
Design firm
(512) 382-3443
Location
1050 Democracy, Bexar County, Texas
County
Bexar
TDLR project
COPT Potranco Romp03 and 04 Fit-Out
Facility
Rockfish
Owner
COPT San Antonio LP
Estimated cost
$18,620,000
Square footage
33,411
Type of work
Renovation/Alteration
Scope
Interior fit-out of an existing data center building. Work includes construction of interior partitions, ceilings, finishes, mechanical, electrical, plumbing, and fire protection systems for the new data hall and its mechanical and electrical spaces.
Status
Inspection Complete
Design firm
(303) 595-8585
Location
1511 NW Crossroads Bldg. 1, Bexar County, Texas
County
Bexar
TDLR project
VANTAGE DATA CENTER (TX12)
Facility
TX12
Owner
VANTAGE DATA CENTERS TX1 LLC
Estimated cost
$276,878,327
Square footage
432,800
Type of work
New Construction
Scope
TX12 is a new vantage data center at TX1 campus consisting of 2-story building with up to 96MW of critical IT capacity. LEVEL 1: 216,400 GSF / LEVEL 2: 216,400 GSF / TOTAL 432,800 GSF
Status
Review Complete
Design firm
512.496.2371
Location
17420 Omicron Dr, Bexar County, Texas
County
Bexar
TDLR project
Data Center Building TX11
Facility
TX11
Owner
VANTAGE DATA CENTERS TX1 LLC
Estimated cost
$95,823,731
Square footage
242,667
Type of work
New Construction
Scope
TX11 is a 2 story data center building with a total of 32MW capacity. The building includes four 8MW data halls, support spaces, office areas, shipping & receiving and storage areas. Total gross building area is 242,667 sq ft.
Status
Inspection Complete
Design firm
(313) 633-2900
Location
14720 Omicron Dr., Bexar County, Texas
County
Bexar
TDLR project
SAT14 - Phase 1
Facility
SAT14 Data Center
Owner
Microsoft
Estimated cost
$154,900,000
Square footage
259,000
Type of work
New Construction
Scope
Site and two building shells (152,000 sf and 107,000 sf). Each structure includes an adminstrative component as well as data center. Finish-out of one administrative areas as well as 2 of 5 colo facilities.
Status
Inspection Complete
Design firm
512-472-6721
Location
3545 Wiseman Boulevard, Bexar County, Texas
County
Bexar
TDLR project
Lavender Hill Romp 03 and 04 Fit-Out
Facility
Rockfish
Owner
Amazon Data Services, Inc.
Estimated cost
$18,620,000
Square footage
33,411
Type of work
Renovation/Alteration
Scope
Interior fit-out of an existing data center building. Work includes construction of interior partitions, ceilings, finishes, mechanical, electrical, plumbing, and fire protection systems for the new data hall and its mechanical and electrical spaces.
Status
Review Complete
Design firm
(303) 595-8585
Location
2200 State Highway 211, Bexar County, Texas
County
Bexar
TDLR project
Microsoft Chevron/SN7 Colo 1
Facility
Microsoft Chevron
Owner
Microsoft (Reuben Thissen)
Estimated cost
$44,000,000
Square footage
60,570
Type of work
Renovation/Alteration
Scope
Complete the existing building with an administration area, loading dock, equipment service yard and colo 1. 7.2 MW for the colo and associated equipment service yard.
Status
Inspection Complete
Design firm
(214) 748-2000
Location
5200 Rogers Road, Bexar County, Texas
County
Bexar
TDLR project
Microsoft SN1 X-ARCHIVE
Facility
Microsoft Data Center (Microsoft San Antonio Chevron)
Owner
Microsoft Corporation
Estimated cost
$5,000,000
Square footage
2,120
Type of work
Renovation/Alteration
Scope
Addition of an interior archive enclosure within an existing facility. Work includes insulated walls and ceiling, vapor barrier, insulated door with seals, and hardware coordination for rack access. Associated MEP components will be integrated with
Status
Review Complete
Design firm
(210) 214-8319
Location
5150 Rodgers Rd, Bexar County, Texas
County
Bexar
TDLR project
QTS SAT2-DC1
Facility
QTS SAT2-DC1
Owner
QTS Data Centers
Estimated cost
$60,000,000
Square footage
338,000
Type of work
New Construction
Scope
The QTS SAT2-DC1 project is a three story data center located at the corner of Ingram Road and Potranco Road in San Antonio, Texas. The facility is 338,721 square feet an can support 45MW of critical power. The day one build will be 9MW.
Status
Project Closed
Design firm
(214) 757-1728
Location
8535 Potranco Road, Bexar County, Texas
County
Bexar
TDLR project
CyrusOne SAT VI - DH 130 & 230 N Fitout
Facility
CyrusOne SAT VI
Owner
CyrusOne LLC
Estimated cost
$32,250,000
Square footage
67,812
Type of work
Renovation/Alteration
Scope
The project proposes the tenant improvements of data halls 130 & 230(67,812 sf) along with associated infrastructure to support those rooms such as additional modular UPS systems, diesel engine generators and mechanical systems on the roof.
Status
Project Registered
Design firm
(214) 757-1762
Location
14719 Omicron Dr, Bexar County, Texas
County
Bexar
TDLR project
Microsoft SN1-SN2 UPS Replacement and Power Harvest
Facility
SN1 and SN2
Owner
Microsoft
Estimated cost
$45,000,000
Square footage
302,200
Type of work
Renovation/Alteration
Scope
Conversion of storage rooms into expansion colos for SN1 bldg and SN2 bldg. Addition of cable trays and PDUs in colos.
Status
Review Complete
Design firm
(214) 748-2000
Location
5150 Rogers Rd, Bexar County, Texas
County
Bexar
TDLR project
TX11 OPEL Fit-Up
Facility
TX11
Owner
Vantage Data Centers TX11
Estimated cost
$95,000,000
Square footage
117,044
Type of work
New Construction
Scope
TX11 OPEL Fit-Up includes 32MW DM tenant build out, customer office and storage area.
Status
Inspection Complete
Design firm
1-312-633-2900
Location
14720 Omicron Dr, Bexar County, Texas
County
Bexar
TDLR project
COPT Potranco Romp04 Liquid Cooling
Facility
Building 1
Owner
COPT SAN ANTONIO LP
Estimated cost
$6,000,000
Square footage
8,000
Type of work
Renovation/Alteration
Scope
Interior alteration of an existing data center building to incorporate liquid cooling equipment for portion of the building interior.
Status
Project Registered
Design firm
(303) 595-8585
Location
1511 NW Crossroads, Bexar County, Texas
County
Bexar
TDLR project
Vantage Data Centers TX21 Core and Shell +16MW Fit-Out
Facility
VDC TX21
Owner
Vantage Data Centers
Estimated cost
$157,000,000
Square footage
360,000
Type of work
New Construction
Scope
3-story Data Center, This phase has 2 levels of shell for future data halls and 1 level of data center space with service yards and various support spaces.
Status
Review Complete
Design firm
214-757-1835
Location
5207 Rogers Road, Bexar County, Texas
County
Bexar
TDLR project
TX11-SAT26
Facility
TX11
Owner
Scott Meier
Estimated cost
$50,000,000
Square footage
114,912
Type of work
New Construction
Scope
TX11 SAT26 includes customer office and storage area, and 32MW DM tenant build out. Programmatically, the data center build out is comprised of three main functional area blocks, including COLO data-hall(s), administration and security.
Status
Review Complete
Design firm
(312) 633-2900
Location
14720 Omicron Dr., Bexar County, Texas
County
Bexar
TDLR project
SAT 16
Facility
SAT 16
Owner
Microsoft
Estimated cost
$215,000,000
Square footage
245,000
Type of work
New Construction
Scope
Building shell and fit out associated with 245,00 square foot data center including administrative components and data center. Finish-out of administrative areas as well as 5 colo facilities.
Status
Project Registered
Design firm
214-977-3554
Location
3555 Westover Link San Antonio, TX 78251, Bexar County, Texas
County
Bexar
TDLR project
Vantage Data Centers TX22
Facility
TX22
Owner
Retained Vantage Data Centers Development
Estimated cost
$272,150,000
Square footage
214,526
Type of work
New Construction
Scope
New 2-story Data Center for Data Processing
Status
Project Registered
Design firm
(214) 748-2000
Location
5207 Rogers Road, Bexar County, Texas
County
Bexar
TDLR project
SAT15
Facility
SAT15 Data Center
Owner
Mircosoft
Estimated cost
$215,900,000
Square footage
245,000
Type of work
New Construction
Scope
Site and building shell associated with 245,00 square foot data center including administrative components and data center. Finish-out of administrative areas as well as 5 colo facilities.
Status
Review Complete
Design firm
(512) 472-6721
Location
3555 Westover Link, Bexar County, Texas
County
Bexar
TDLR project
SAT 23 Data Hall 4 Fit Out
Facility
SAT B1
Owner
Stream Data Centers
Estimated cost
$10,000,000
Square footage
24,000
Type of work
Renovation/Alteration
Scope
24,000 SF tenant fit-out of data hall space.
Status
Review Complete
Design firm
(214) 757-1613
Location
11203 MILITARY DR. W SAN ANTONIO, TEXAS, Bexar County, Texas
County
Bexar
TDLR project
CyrusOne-SAT VI TRP 2
Facility
CyrusOne-SAT VI TRP2
Owner
CyrusOne
Estimated cost
$50,000,000
Square footage
112,175
Type of work
New Construction
Scope
New construction building, 132,070 SF of two-story data center, 19,895 sf of two-story office
Status
Project Registered
Design firm
(214) 757-1622
Location
14719 Omicron Dr, Bexar County, Texas
County
Bexar
TDLR project
SAT 17
Facility
SAT 17
Owner
Jon Rhea
Estimated cost
$215,000,000
Square footage
245,000
Type of work
New Construction
Scope
Building shell and fit out associated with 245,00 square foot data center including administrative components and data center. Finish-out of administrative areas as well as 5 colo facilities.
Status
Project Registered
Design firm
(816) 645-6299
Location
3555 Westover Link San Antonio, TX 78251 , San An, Bexar County, Texas
County
Bexar
Queue capacity (Gas)
34.5 MW
Queue capacity (Other)
5,436.42 MW
Queue capacity (Solar)
152.32 MW

Water records

Full water records (public feeds)
Groundwater conservation district
EDWARDS AQUIFER AUTHORITY

Politics records

School district
East Central Independent School District
Students
11,176
Assessed value
$11,207,852,010
School district
Northside Independent School District
Students
101,095
School district
San Antonio Independent School District
Students
44,670
Assessed value
$35,738,168,761
State House
District 116 — Trey Martinez Fischer (D)
State House
District 117 — Philip Cortez (D)
State House
District 118 — John Lujan (R)
State House
District 122 — Mark Dorazio (R)
State House
District 124 — Josey Garcia (D)
State Senate
District 19 — Roland Gutierrez (D)
State Senate
District 21 — Judith Zaffirini (D)
State Senate
District 26 — Jose Menendez (D)
Congressional
District 20 — Joaquin Castro (D)
Congressional
District 23 — Tony Gonzales (R)
Congressional
District 28 — Henry Cuellar (D)
Congressional
District 35 — Greg Casar (D)
Portal platform
CivicPlus AgendaCenter
Agenda portal
https://www.bexar.org/AgendaCenter
Meeting schedule
Every other Tuesday 9:00 a.m. — Commissioners Courtroom, Bexar County Courthouse (Room 2.01), 100 Dolorosa, San Antonio
Top taxpayers
Subscribe to see
M&O collections
Subscribe to see
Per-student spend
Subscribe to see
Median household income
Subscribe to see
Top industries
Subscribe to see
Population
Subscribe to see
  • School-district economics (annual) are shown for East Central Independent School District (most cert sites); 2 other districts on record.

Sources: Texas Geographic Information Office · Texas Department of Licensing and Regulation · Texas Water Development Board · ERCOT

Frequently asked questions

How many data center projects does Bexar County have in public records?

Bexar County has 50 TDLR construction filings in the public feeds this atlas tracks.

What is the largest TDLR data-center filing cost on record in Bexar County?

TX12 TFO lists an estimated cost of $448,000,000 in TDLR public records for Bexar County.

Which groundwater districts appear at known Bexar County data-center sites?

Public records for known project locations name EDWARDS AQUIFER AUTHORITY. District boundaries do not follow county lines, so this is point-derived, not whole-county coverage.

When does Bexar County Commissioners Court meet?

Bexar County Commissioners Court schedule in this atlas: Every other Tuesday 9:00 a.m. — Commissioners Courtroom, Bexar County Courthouse (Room 2.01), 100 Dolorosa, San Antonio Agendas via CivicPlus AgendaCenter.

Annual subscriber data

Bexar County — locked fields

The free brief and map above name public projects and county-level jurisdictions. Annual access unlocks who governs a specific pin on the map and fills the tax-base fields below.

School district

  • Top taxpayersAnnual
  • M&O collectionsAnnual
  • Per-student spendAnnual

County

  • Median household incomeAnnual
  • Top industriesAnnual
  • PopulationAnnual

Subscribe annually for pin-level jurisdictions on the county map (who governs a specific site) plus school-district tax-base fields (top taxpayers, M&O, per-pupil)

View annual plans