Data Centers in La Salle County
Under constructionLa Salle County hosts 1 TDLR data-center construction filing Projects touch 1 school district (Cotulla Independent School District). U.S. House seats in the record: District 23. Free brief: power, water, and politics from those records. Annual unlocks school-district tax-base fields (top taxpayers, M&O, per-pupil) and who governs a specific pin on the map.
Power
La Salle County power records from Comptroller certificates and TDLR filings. TDLR project names include Love's 298 EV Charging Staton. Love's 298 EV Charging Staton lists an estimated cost of $600,000. Nearby ERCOT queue capacity summarized by fuel includes 1,128 MW Solar; 898 MW Other; 197 MW Wind. Approximate sites stay county-level when geocode quality does not support a precise city.
Water
Water at project locations (not whole-county coverage). Known sites name WINTERGARDEN GROUNDWATER CONSERVATION DISTRICT. District boundaries do not follow county lines.
Politics
La Salle County siting records (not a full voter guide). School districts appearing on certified or filed sites include Cotulla Independent School District. U.S. House districts in the record: District 23 — Tony Gonzales (R). State House: District 31 — Ryan Guillen (R). State Senate: District 21 — Judith Zaffirini (D). Tax-base fields (top taxpayers, M&O, per-pupil) stay annual-only. Pin-level “who governs this parcel” is annual on the map.
Loading map…
Power records
Full power records (public feeds)
- TDLR project
- Love's 298 EV Charging Staton
- Facility
- Loves Travel Stops & Country Stores
- Owner
- Love's Travel Stops & Country Stores Inc.
- Estimated cost
- $600,000
- Square footage
- 1,600
- Type of work
- Renovation/Alteration
- Scope
- Installation of two dual electric vehicle charging stations, four powerblock modules, one 2000A electrical switchgear
- Status
- Project Closed
- Design firm
- 724-716-8127
- Location
- 28527 I-35, La Salle County, Texas
- County
- La Salle
- Queue capacity (Other)
- 897.96 MW
- Queue capacity (Solar)
- 1,128.05 MW
- Queue capacity (Wind)
- 197.01 MW
Water records
Full water records (public feeds)
- Groundwater conservation district
- WINTERGARDEN GROUNDWATER CONSERVATION DISTRICT
Politics records
- School district
- Cotulla Independent School District
- Students
- 1,143
- Assessed value
- $8,493,141,914
- State House
- District 31 — Ryan Guillen (R)
- State Senate
- District 21 — Judith Zaffirini (D)
- Congressional
- District 23 — Tony Gonzales (R)
- Top taxpayers
- Subscribe to see
- M&O collections
- Subscribe to see
- Per-student spend
- Subscribe to see
- Median household income
- Subscribe to see
- Top industries
- Subscribe to see
- Population
- Subscribe to see
Sources: Texas Geographic Information Office · Texas Department of Licensing and Regulation · Texas Water Development Board · ERCOT
Frequently asked questions
How many data center projects does La Salle County have in public records?
La Salle County has 1 TDLR construction filing in the public feeds this atlas tracks.
What is the largest TDLR data-center filing cost on record in La Salle County?
Love's 298 EV Charging Staton lists an estimated cost of $600,000 in TDLR public records for La Salle County.
Which groundwater districts appear at known La Salle County data-center sites?
Public records for known project locations name WINTERGARDEN GROUNDWATER CONSERVATION DISTRICT. District boundaries do not follow county lines, so this is point-derived, not whole-county coverage.
Annual subscriber data
La Salle County — locked fields
The free brief and map above name public projects and county-level jurisdictions. Annual access unlocks who governs a specific pin on the map and fills the tax-base fields below.
School district
- Top taxpayersAnnual
- M&O collectionsAnnual
- Per-student spendAnnual
County
- Median household incomeAnnual
- Top industriesAnnual
- PopulationAnnual
Subscribe annually for pin-level jurisdictions on the county map (who governs a specific site) plus school-district tax-base fields (top taxpayers, M&O, per-pupil)
View annual plans