Data Centers in Smith County

Under construction

Smith County hosts 3 TDLR data-center construction filings Projects touch 2 school districts (Chapel Hill Independent School District and Winona Independent School District). U.S. House seats in the record: District 1. Free brief: power, water, and politics from those records. Annual unlocks school-district tax-base fields (top taxpayers, M&O, per-pupil) and who governs a specific pin on the map.

Power

Smith County power records from Comptroller certificates and TDLR filings. TDLR project names include WTY1 - Project Paradigm, 06-23 Smith County IT Data Center Improvements, and Amazon River's Edge. WTY1 - Project Paradigm lists an estimated cost of $28,000,000. Nearby ERCOT queue capacity summarized by fuel includes 201 MW Other. Approximate sites stay county-level when geocode quality does not support a precise city.

Water

Water at project locations (not whole-county coverage). At least one known site falls outside any GCD at its recorded coordinate. District boundaries do not follow county lines.

Politics

Smith County siting records (not a full voter guide). School districts appearing on certified or filed sites include Chapel Hill Independent School District and Winona Independent School District. U.S. House districts in the record: District 1 — Nathaniel Moran (R). State House: District 5 — Cole Hefner (R); District 6 — Daniel Alders (R). State Senate: District 1 — Bryan Hughes (R). Tax-base fields (top taxpayers, M&O, per-pupil) stay annual-only. Pin-level “who governs this parcel” is annual on the map.

Loading map…

Power records

Full power records (public feeds)
TDLR project
WTY1 - Project Paradigm
Facility
WTY1 - Project Paradigm
Owner
Amazon.Com Services LLC
Estimated cost
$28,000,000
Square footage
140,820
Type of work
New Construction
Scope
140,820 SQ FT New concrete single story fully sprinklered building (S-1 OCC.), Drive Thru can loading canopy (S-2 OCC.), with support office are (8 OCC.). Break room (A-2 OOC.) and training room (A-3 OCC.)
Status
Project Closed
Design firm
(330) 396-5699
Location
12152 CR 334, Smith County, Texas
County
Smith
TDLR project
06-23 Smith County IT Data Center Improvements
Facility
Smith County Annex
Owner
Smith County
Estimated cost
$2,000,000
Square footage
1,500
Type of work
Renovation/Alteration
Scope
Exterior work consists of removal and replacement of generator(s), pad, and enclosure. Interior work consists of renovating existing office space into a new, larger data center.
Status
Project Registered
Design firm
903.590.4787
Location
200 E. Ferguson St., Suite 213, Smith County, Texas
County
Smith
TDLR project
Amazon River's Edge
Facility
Caldwell Zoo
Owner
The Caldwell Foundation
Estimated cost
$10,000,000
Square footage
130,000
Type of work
New Construction
Scope
Replace existing infrastructure with new facilities including 9 buildings totaling approximately 11,300 square feet, a 10000 square foot walk through aviary, an otter exhibit, jaguar exhibit, primate exhibit, and walkways.
Status
Project Closed
Design firm
(215) 557-6509
Location
2203 M.L. King Jr. Blvd P.O. Box 4785, Smith County, Texas
County
Smith
Queue capacity (Other)
200.87 MW

Water records

Full water records (public feeds)
Groundwater conservation district
No groundwater conservation district covers this location.

Politics records

School district
Chapel Hill Independent School District
Students
3,270
Assessed value
$2,585,942,943
School district
Winona Independent School District
Students
1,153
Assessed value
$1,098,067,933
State House
District 5 — Cole Hefner (R)
State House
District 6 — Daniel Alders (R)
State Senate
District 1 — Bryan Hughes (R)
Congressional
District 1 — Nathaniel Moran (R)
Top taxpayers
Subscribe to see
M&O collections
Subscribe to see
Per-student spend
Subscribe to see
Median household income
Subscribe to see
Top industries
Subscribe to see
Population
Subscribe to see
  • School-district economics (annual) are shown for Chapel Hill Independent School District (most cert sites); 1 other district on record.

Sources: Texas Geographic Information Office · Texas Department of Licensing and Regulation · Texas Water Development Board · ERCOT

Frequently asked questions

How many data center projects does Smith County have in public records?

Smith County has 3 TDLR construction filings in the public feeds this atlas tracks.

What is the largest TDLR data-center filing cost on record in Smith County?

WTY1 - Project Paradigm lists an estimated cost of $28,000,000 in TDLR public records for Smith County.

Annual subscriber data

Smith County — locked fields

The free brief and map above name public projects and county-level jurisdictions. Annual access unlocks who governs a specific pin on the map and fills the tax-base fields below.

School district

  • Top taxpayersAnnual
  • M&O collectionsAnnual
  • Per-student spendAnnual

County

  • Median household incomeAnnual
  • Top industriesAnnual
  • PopulationAnnual

Subscribe annually for pin-level jurisdictions on the county map (who governs a specific site) plus school-district tax-base fields (top taxpayers, M&O, per-pupil)

View annual plans