Data Centers in Armstrong County
Under constructionArmstrong County hosts 1 Comptroller-certified site and 10 TDLR construction filings Projects touch 1 school district (Claude Independent School District). U.S. House seats in the record: District 13. Free brief: power, water, and politics from those records. Annual unlocks school-district tax-base fields (top taxpayers, M&O, per-pupil) and who governs a specific pin on the map.
Power
Armstrong County power records from Comptroller certificates and TDLR filings. Certified names in the public record include Project Goodnight. TDLR project names include Llano Building 1, Project Llano, Project Llano, Llano Building 2, Project Llano, Project Llano, and 4 more. Project Llano lists an estimated cost of $500,000,000. Nearby ERCOT queue capacity summarized by fuel includes 1,703 MW Wind; 1,043 MW Other; 504 MW Solar. Approximate sites stay county-level when geocode quality does not support a precise city.
Water
Water at project locations (not whole-county coverage). Known sites name PANHANDLE GROUNDWATER CONSERVATION DISTRICT. District boundaries do not follow county lines.
Politics
Armstrong County siting records (not a full voter guide). School districts appearing on certified or filed sites include Claude Independent School District. U.S. House districts in the record: District 13 — Ronny Jackson (R). State House: District 86 — John T. Smithee (R). State Senate: District 31 — Kevin Sparks (R). Commissioners court agendas run via custom (2nd Monday 9:00 a.m. — Armstrong County Courthouse, 101 Trice St., Claude). Tax-base fields (top taxpayers, M&O, per-pupil) stay annual-only. Pin-level “who governs this parcel” is annual on the map.
Loading map…
Power records
Full power records (public feeds)
- Certified site
- Project Goodnight
- Occupant
- GN DC1, LLC
- Certificate type
- large
- Nearest city
- Claude
- TDLR project
- Llano Building 1
- Facility
- Llano Building 1
- Owner
- GN DC1 LLC
- Estimated cost
- $292,000,000
- Square footage
- 484,954
- Type of work
- New Construction
- Scope
- New approx. 484,954 SF 1 story Data Center. New approx. 300 SF Guard House. New approx. 2,400 SF Fire Pump building. Various mechanical and electrical enclosures on the site.
- Status
- Review Complete
- Design firm
- (714) 639-9860
- Location
- 10001 Lima Rd, Armstrong County, Texas
- County
- Armstrong
- TDLR project
- Project Llano
- Facility
- Building 1 TI
- Owner
- GN DC1 LLC
- Estimated cost
- $500,000,000
- Square footage
- 484,965
- Type of work
- New Construction
- Scope
- Single-story data center. The architectural interior build-out will include four data halls and associated office support spaces.
- Status
- Review Complete
- Design firm
- (214) 969-3065
- Location
- 10001 Lima Road, Armstrong County, Texas
- County
- Armstrong
- TDLR project
- Project Llano
- Facility
- Building 4
- Owner
- GN DC1, LLC
- Estimated cost
- $500,000,000
- Square footage
- 805,380
- Type of work
- New Construction
- Scope
- Single story Data Center approximately 805,380 sf, constructed of structural steel columns, beams and framing, insulated metal panels, and glazed curtain wall. It will include office space, multiple data halls and associated support spaces.
- Status
- Review Complete
- Design firm
- (241)969-3065
- Location
- 10001 Lima Road, Armstrong County, Texas
- County
- Armstrong
- TDLR project
- Llano Building 2
- Facility
- Llano Building 2
- Owner
- GN DC1 LLC
- Estimated cost
- $292,000,000
- Square footage
- 484,954
- Type of work
- New Construction
- Scope
- New approx. 484,954 SF 1 story Data Center.
- Status
- Project Registered
- Design firm
- (714) 639-9860
- Location
- 10001 Lima Rd, Armstrong County, Texas
- County
- Armstrong
- TDLR project
- Project Llano
- Facility
- Building 5
- Owner
- GN DC1, LLC
- Estimated cost
- $500,000,000
- Square footage
- 805,380
- Type of work
- New Construction
- Scope
- Single story Data Center approximately 805,380 sf, constructed of structural steel columns, beams and framing, insulated metal panels, and glazed curtain wall. It will include office space, multiple data halls and associated support spaces.
- Status
- Project Registered
- Design firm
- (214)969-3065
- Location
- 10001 Lima Road, Armstrong County, Texas
- County
- Armstrong
- TDLR project
- Project Llano
- Facility
- Building 6
- Owner
- GN DC1, LLC
- Estimated cost
- $500,000,000
- Square footage
- 805,380
- Type of work
- New Construction
- Scope
- Single story Data Center approximately 805,380 sf, constructed of structural steel columns, beams and framing, insulated metal panels, and glazed curtain wall. It will include office space, multiple data halls and associated support spaces.
- Status
- Project Registered
- Design firm
- (214)969-3065
- Location
- 10001 Lima Road, Armstrong County, Texas
- County
- Armstrong
- TDLR project
- Llano Building 3
- Facility
- Llano Building 3
- Owner
- GN DC1 LLC
- Estimated cost
- $500,000,000
- Square footage
- 805,308
- Type of work
- New Construction
- Scope
- An approximately 805,380 square foot single story data center constructed with structural steel columns, beams and framing. It will contain office space, multiple data halls and associated support spaces.
- Status
- Project Registered
- Location
- 10001 Lima Rd, Armstrong County, Texas
- County
- Armstrong
- TDLR project
- Llano Building 4
- Facility
- Llano Building 4
- Owner
- GN DC1 LLC
- Estimated cost
- $500,000,000
- Square footage
- 805,308
- Type of work
- New Construction
- Scope
- New construction of approximately 805,380 square feet single story data center constructed of steel columns, beams and framing and containing office space, data halls and associated support area.
- Status
- Project Registered
- Location
- 10001 Lima Rd, Armstrong County, Texas
- County
- Armstrong
- TDLR project
- Project Llano
- Facility
- Building 2 TI
- Owner
- GN DC1 LLC
- Estimated cost
- $500,000,000
- Square footage
- 484,954
- Type of work
- New Construction
- Scope
- Single-story data center. The architectural interior build-out will include four data halls and associated office support spaces.
- Status
- Review Complete
- Design firm
- (214) 969-3065
- Location
- 10001 Lima Road, Armstrong County, Texas
- County
- Armstrong
- TDLR project
- Project Llano
- Facility
- Building 3
- Owner
- GN DC1, LLC
- Estimated cost
- $500,000,000
- Square footage
- 805,380
- Type of work
- New Construction
- Scope
- Single story Data Center approximately 805,380 sf, constructed of structural steel columns, beams and framing, insulated metal panels, and glazed curtain wall. It will include office space, multiple data halls and associated support spaces.
- Status
- Review Complete
- Design firm
- (241)969-3065
- Location
- 10001 Lima Road, Armstrong County, Texas
- County
- Armstrong
- Queue capacity (Other)
- 1,043.08 MW
- Queue capacity (Solar)
- 503.56 MW
- Queue capacity (Wind)
- 1,703.2 MW
Water records
Full water records (public feeds)
- Groundwater conservation district
- PANHANDLE GROUNDWATER CONSERVATION DISTRICT
Politics records
- School district
- Claude Independent School District
- Students
- 319
- Assessed value
- $633,231,090
- State House
- District 86 — John T. Smithee (R)
- State Senate
- District 31 — Kevin Sparks (R)
- Congressional
- District 13 — Ronny Jackson (R)
- Portal platform
- custom
- Agenda portal
- https://www.co.armstrong.tx.us/page/armstrong.Commissioners.Court
- Meeting schedule
- 2nd Monday 9:00 a.m. — Armstrong County Courthouse, 101 Trice St., Claude
- Top taxpayers
- Subscribe to see
- M&O collections
- Subscribe to see
- Per-student spend
- Subscribe to see
- Median household income
- Subscribe to see
- Top industries
- Subscribe to see
- Population
- Subscribe to see
Sources: Texas Geographic Information Office · Texas Comptroller · Texas Department of Licensing and Regulation · Texas Water Development Board · ERCOT
Frequently asked questions
How many data center projects does Armstrong County have in public records?
Armstrong County has 1 Comptroller-certified data-center site and 10 TDLR construction filings in the public feeds this atlas tracks.
What is the largest TDLR data-center filing cost on record in Armstrong County?
Project Llano lists an estimated cost of $500,000,000 in TDLR public records for Armstrong County.
Which groundwater districts appear at known Armstrong County data-center sites?
Public records for known project locations name PANHANDLE GROUNDWATER CONSERVATION DISTRICT. District boundaries do not follow county lines, so this is point-derived, not whole-county coverage.
When does Armstrong County Commissioners Court meet?
Armstrong County Commissioners Court schedule in this atlas: 2nd Monday 9:00 a.m. — Armstrong County Courthouse, 101 Trice St., Claude Agendas via custom.
Annual subscriber data
Armstrong County — locked fields
The free brief and map above name public projects and county-level jurisdictions. Annual access unlocks who governs a specific pin on the map and fills the tax-base fields below.
School district
- Top taxpayersAnnual
- M&O collectionsAnnual
- Per-student spendAnnual
County
- Median household incomeAnnual
- Top industriesAnnual
- PopulationAnnual
Subscribe annually for pin-level jurisdictions on the county map (who governs a specific site) plus school-district tax-base fields (top taxpayers, M&O, per-pupil)
View annual plans