Data Centers in Childress County
Under constructionChildress County hosts 3 Comptroller-certified sites and 2 TDLR construction filings Projects touch 1 school district (Childress Independent School District). U.S. House seats in the record: District 13. Free brief: power, water, and politics from those records. Annual unlocks school-district tax-base fields (top taxpayers, M&O, per-pupil) and who governs a specific pin on the map.
Power
Childress County power records from Comptroller certificates and TDLR filings. Certified names in the public record include Lancium Clean Campus - Childress 1, Childress Data Center, and IREN / Iris Energy Childress. TDLR project names include Childress Data Center Campus Upgrades and Iris - Childress Data Center. Childress Data Center Campus Upgrades lists an estimated cost of $15,000,000. Nearby ERCOT queue capacity summarized by fuel includes 503 MW Solar; 100 MW Other. Approximate sites stay county-level when geocode quality does not support a precise city.
Water
Water at project locations (not whole-county coverage). Known sites name GATEWAY GROUNDWATER CONSERVATION DISTRICT. For some sites, enrichment has not yet determined GCD status. District boundaries do not follow county lines.
Politics
Childress County siting records (not a full voter guide). School districts appearing on certified or filed sites include Childress Independent School District. U.S. House districts in the record: District 13 — Ronny Jackson (R). State House: District 88 — Ken King (R). State Senate: District 28 — Charles Perry (R). Tax-base fields (top taxpayers, M&O, per-pupil) stay annual-only. Pin-level “who governs this parcel” is annual on the map.
Loading map…
Power records
Full power records (public feeds)
- Certified site
- Lancium Clean Campus - Childress 1
- Occupant
- Lancium LLC
- Certificate type
- large
- Certified site
- Childress Data Center
- Occupant
- IE US Hardware 4 Inc.
- Certificate type
- large
- Certified site
- IREN / Iris Energy Childress
- Opening year
- 2023
- TDLR project
- Childress Data Center Campus Upgrades
- Facility
- Childress Operations Building
- Owner
- IE US Development Holdings 3 Inc
- Estimated cost
- $15,000,000
- Square footage
- 29,000
- Type of work
- New Construction
- Scope
- 29,000 SF office building
- Status
- Review Complete
- Design firm
- 512-658-0205
- Location
- 620 FM 1033, Childress County, Texas
- County
- Childress
- TDLR project
- Iris - Childress Data Center
- Facility
- Office Building
- Owner
- IE US Development Holdings 3 Inc.
- Estimated cost
- $3,863,400
- Square footage
- 14,964
- Type of work
- New Construction
- Scope
- Ground up construction of 14,964 SF one story pre-engineered metal building. The use will comprise of Group B occupancy for office, professional or service-type transactions, including storage of records and accounts.
- Status
- Inspection Complete
- Design firm
- (832) 299-4844
- Location
- 620 FM 1033, Childress County, Texas
- County
- Childress
- Queue capacity (Other)
- 100 MW
- Queue capacity (Solar)
- 502.58 MW
- Approximate location — county level.
Water records
Full water records (public feeds)
- Groundwater conservation district
- GATEWAY GROUNDWATER CONSERVATION DISTRICT
- Groundwater conservation district
- Not determined.
Politics records
- School district
- Childress Independent School District
- Students
- 976
- Assessed value
- $796,093,757
- State House
- District 88 — Ken King (R)
- State Senate
- District 28 — Charles Perry (R)
- Congressional
- District 13 — Ronny Jackson (R)
- Top taxpayers
- Subscribe to see
- M&O collections
- Subscribe to see
- Per-student spend
- Subscribe to see
- Median household income
- Subscribe to see
- Top industries
- Subscribe to see
- Population
- Subscribe to see
Sources: Texas Geographic Information Office · Texas Comptroller · Texas Department of Licensing and Regulation · Texas Water Development Board · ERCOT
Frequently asked questions
How many data center projects does Childress County have in public records?
Childress County has 3 Comptroller-certified data-center sites and 2 TDLR construction filings in the public feeds this atlas tracks.
What is the largest TDLR data-center filing cost on record in Childress County?
Childress Data Center Campus Upgrades lists an estimated cost of $15,000,000 in TDLR public records for Childress County.
Which groundwater districts appear at known Childress County data-center sites?
Public records for known project locations name GATEWAY GROUNDWATER CONSERVATION DISTRICT. District boundaries do not follow county lines, so this is point-derived, not whole-county coverage.
Annual subscriber data
Childress County — locked fields
The free brief and map above name public projects and county-level jurisdictions. Annual access unlocks who governs a specific pin on the map and fills the tax-base fields below.
School district
- Top taxpayersAnnual
- M&O collectionsAnnual
- Per-student spendAnnual
County
- Median household incomeAnnual
- Top industriesAnnual
- PopulationAnnual