Data Centers in Collin County
Under constructionCollin County hosts 10 Comptroller-certified sites and 61 TDLR construction filings Projects touch 5 school districts (Allen Independent School District, Frisco Independent School District, McKinney Independent School District, Plano Independent School District, and Prosper Independent School District). U.S. House seats in the record: District 3, District 4, and District 32. Free brief: power, water, and politics from those records. Annual unlocks school-district tax-base fields (top taxpayers, M&O, per-pupil) and who governs a specific pin on the map.
Power
Collin County power records from Comptroller certificates and TDLR filings. Certified names in the public record include Lincoln Rackhouse, Princeton ProjectCo LLC, CyrusOne Allen DFW3, Compass Allen I, Aligned DFW-01 Plano, DataBank DFW3 Plano, T5@Dallas, STACK DFW01, and 2 more. TDLR project names include DFW04 TFO, Amazon Dental, Paradise Suites Salon, Amazon (DDX2), Compass Frisco ASC, DFW04, and 55 more. DFW04 lists an estimated cost of $161,000,000. Nearby ERCOT queue capacity summarized by fuel includes 1,181 MW Other. Approximate sites stay county-level when geocode quality does not support a precise city.
Water
Water at project locations (not whole-county coverage). Known sites name NORTH TEXAS GROUNDWATER CONSERVATION DISTRICT. For some sites, enrichment has not yet determined GCD status. District boundaries do not follow county lines.
Politics
Collin County siting records (not a full voter guide). School districts appearing on certified or filed sites include Allen Independent School District, Frisco Independent School District, McKinney Independent School District, Plano Independent School District, and Prosper Independent School District. U.S. House districts in the record: District 3 — Keith Self (R); District 4 — Pat Fallon (R); District 32 — Julie Johnson (D). State House: District 33 — Katrina Pierson (R); District 61 — Keresa Richardson (R); District 66 — Matt Shaheen (R); District 67 — Jeff Leach (R); District 70 — Mihaela Plesa (D); District 89 — Candy Noble (R). State Senate: District 2 — Bob Hall (R); District 8 — Angela Paxton (R); District 30 — Brent Hagenbuch (R). Tax-base fields (top taxpayers, M&O, per-pupil) stay annual-only. Pin-level “who governs this parcel” is annual on the map.
Loading map…
Power records
Full power records (public feeds)
- Certified site
- Lincoln Rackhouse
- Occupant
- Coreweave, Inc.
- Certificate type
- large
- City
- Plano
- Certified site
- Princeton ProjectCo LLC
- Occupant
- Princeton ProjectCo LLC
- Certificate type
- qualifying
- Certified site
- CyrusOne Allen DFW3
- Opening year
- 2018
- City
- Allen
- Certified site
- Compass Allen I
- Opening year
- 2016
- City
- Allen
- Certified site
- Aligned DFW-01 Plano
- Opening year
- 2015
- City
- Plano
- Certified site
- DataBank DFW3 Plano
- Opening year
- 2017
- City
- Plano
- Certified site
- T5@Dallas
- Opening year
- 2012
- City
- Plano
- Certified site
- STACK DFW01
- Opening year
- 2019
- City
- Plano
- Certified site
- State Farm Richardson Data Center
- Opening year
- 2015
- City
- Richardson
- Certified site
- Flexential Dallas-Plano DFW01
- Opening year
- 2015
- City
- Plano
- TDLR project
- DFW04 TFO
- Facility
- DFW04
- Owner
- Aligned Data Centers
- Estimated cost
- $120,000,000
- Square footage
- 169,600
- Type of work
- Renovation/Alteration
- Scope
- 169600 SF tenant fit-out of data hall space.
- Status
- Project Registered
- Design firm
- 214-977-3406
- Location
- 601 North Star Rd., Collin County, Texas
- County
- Collin
- TDLR project
- Amazon Dental
- Facility
- Custer Tour Village
- Owner
- Reddy Gottipolu
- Estimated cost
- $360,000
- Square footage
- 2,380
- Type of work
- New Construction
- Scope
- Interior finish out
- Status
- Project Closed
- Location
- 6201 S Custer Rd Suite 600, Collin County, Texas
- County
- Collin
- TDLR project
- Paradise Suites Salon
- Facility
- Paradise Suites salon
- Owner
- DFW ORACLE VENTURES THREE LLC
- Estimated cost
- $200,000
- Square footage
- 6,000
- Type of work
- Additions to Existing Building
- Scope
- Finish out of existing space for private salon suites
- Status
- Project Registered
- Location
- 1205 W McDermott Dr #120, Collin County, Texas
- County
- Collin
- TDLR project
- Amazon (DDX2)
- Facility
- Amazon (DDX2)
- Owner
- SFG STPK LM MCKINNEY LLC
- Estimated cost
- $2,820,873
- Square footage
- 13,852
- Type of work
- New Construction
- Scope
- Installation of conveyor supports in an existing warehouse.
- Status
- Review Complete
- Location
- 1398 Industrial Blvd., Collin County, Texas
- County
- Collin
- TDLR project
- Compass Frisco ASC
- Facility
- Frisco Station Cambridge MOB
- Owner
- FS CAMBRIDGE MOB JV LP
- Estimated cost
- $5,400,000
- Square footage
- 12,580
- Type of work
- New Construction
- Scope
- 12,580 SQFT AMBULATORY SURGICAL CENTER ON THE 1ST FLOOR OF A MEDICAL OFFICE BUILDING. SCOPE OF PROJECT INCLUDES 4 OPERATING ROOMS WITH ASSOCIATED SUPPORTING FUNCTIONS, GROUND MOUNTED EMERGENCY GENERATOR, AND MEDICAL GAS STORAGE
- Status
- Review Complete
- Design firm
- (817) 226-1917
- Location
- 3501 Wellness Way, Suite 100, Collin County, Texas
- County
- Collin
- TDLR project
- DFW04
- Facility
- DFW04
- Owner
- Aligned Data Centers
- Estimated cost
- $161,000,000
- Square footage
- 425,500
- Type of work
- New Construction
- Scope
- 425,000 SF new-construction data center.
- Status
- Inspection Complete
- Design firm
- (214) 757-1728
- Location
- 601 NORTH STAR ROAD, Collin County, Texas
- County
- Collin
- TDLR project
- Compass
- Facility
- Hall Park - Lakes I
- Owner
- Hall Group
- Estimated cost
- $363,778
- Square footage
- 13,678
- Type of work
- Renovation/Alteration
- Scope
- 13,678 sqft office space
- Status
- Project Closed
- Design firm
- 214-460-6485
- Location
- 2595 Dallas Pkwy #300, Collin County, Texas
- County
- Collin
- TDLR project
- CyrusOne Allen, DH1 Fitup
- Facility
- Allen DH1
- Owner
- Jarred Capp
- Estimated cost
- $200,000
- Square footage
- 204,979
- Type of work
- Renovation/Alteration
- Scope
- The scope includes addition of one data hall and its critical rooms inside the existing one-story data center building.
- Status
- Project Registered
- Location
- 2300 Chelsea Blvrd., Collin County, Texas
- County
- Collin
- TDLR project
- DFW01B - DH 120
- Facility
- STACK DFW01B
- Owner
- STACK INFRASTRUCTURE, INC.
- Estimated cost
- $16,000,000
- Square footage
- 26,000
- Type of work
- Renovation/Alteration
- Scope
- 26,000 SF Fit Out of an existing Data Hall and support spaces including 1,000 SF office and storage space.
- Status
- Project Registered
- Location
- 6715 PINECREST DRIVE, Collin County, Texas
- County
- Collin
- TDLR project
- NEWMAN VILLAGE MIXED USE, TRACT 1, BLOCK C, LOT 4
- Facility
- NEWMAN VILLAGE MIXED USE OPEN SPACE
- Owner
- JIM RANDELL NEWMAN
- Estimated cost
- $430,000
- Square footage
- 119,622
- Type of work
- New Construction
- Scope
- OPEN SPACE WITH PERIMETER AND INTERNAL SIDEWALKS, SITE FURNISHINGS MOVABLE AND ANCHORED IN, PLANTER POTS WITH PEDESTAL, & LANDSCAPE
- Status
- Project Closed
- Design firm
- (972) 509-1266
- Location
- REEDER RIDGE WAY & OLLIE DEAN WAY, FRISCO, TX, Collin County, Texas
- County
- Collin
- TDLR project
- Compass Datacenters DFW I-II, LLC
- Facility
- DFW I-II
- Owner
- Compass Datacenters
- Estimated cost
- $1,000,000
- Square footage
- 1,503,933
- Type of work
- New Construction
- Scope
- Datacenter
- Status
- Project Closed
- Design firm
- (214) 801-4936
- Location
- 820 Allen Commerce Parkway, Collin County, Texas
- County
- Collin
- TDLR project
- FLEXENTIAL PLANO EXPANSION
- Facility
- FLEXENTIAL PLANO
- Owner
- LI PLANO LLC C/O INVESCO REAL ESTATE
- Estimated cost
- $5,000,000
- Square footage
- 146,870
- Type of work
- Additions to Existing Building
- Scope
- 146,000 sf addition to an existing data center building in Plano, TX. Includes ancillary office functions.
- Status
- Review Complete
- Design firm
- (214) 757-1681
- Location
- 3500 E PLANO PKWY, Collin County, Texas
- County
- Collin
- TDLR project
- Magma Suite 275-C
- Facility
- Aligned Energy
- Owner
- Aligned
- Estimated cost
- $1,000,000
- Square footage
- 12,000
- Type of work
- Renovation/Alteration
- Scope
- Tenant fit-out of a shell data hall space
- Status
- Project Registered
- Design firm
- (214) 969-5599
- Location
- 2800 Summit Ave, Collin County, Texas
- County
- Collin
- TDLR project
- Micron Generator
- Facility
- One Bethany
- Owner
- ONE BETHANY DEVELOPMENT PARTNERS LP
- Estimated cost
- $250,000
- Square footage
- 600
- Type of work
- Additions to Existing Building
- Scope
- Backup Generator w/ Screening Wall
- Status
- Project Registered
- Design firm
- (214) 866-2474
- Location
- 950 West Bethany Drive, Collin County, Texas
- County
- Collin
- TDLR project
- Farmhouse 121 - Clubhouse
- Facility
- Building A - Section C - Club
- Owner
- HighPark Capital, LLC
- Estimated cost
- $500,000
- Square footage
- 9,303
- Type of work
- New Construction
- Scope
- Clubhouse/Leasing Office and amenity center serving a 284-unit Multifamily apartment complex on Pad D (12.49 acre) of D E W Babb Survey, Sheet 5, Tract 62
- Status
- Project Closed
- Design firm
- (972) 977-2716
- Location
- SE Corner Lot Pad D @ State Hwy 121 and Milrany Ln, Collin County, Texas
- County
- Collin
- TDLR project
- DFW02 - TRUIST
- Facility
- STACK DFW02
- Owner
- STACK INFRASTRUCTURE
- Estimated cost
- $2,600,000
- Square footage
- 20,000
- Type of work
- Renovation/Alteration
- Scope
- 20,000 SF Fit Out of an existing Data Hall and support spaces including a 475 SF office and storages spaces
- Status
- Project Closed
- Location
- 6715 PINECREST DRIVE, Collin County, Texas
- County
- Collin
- TDLR project
- Level 2 Tenant Office Fit-Out
- Facility
- CyrusOne Allen DFW3
- Owner
- CyrusOne
- Estimated cost
- $500,000
- Square footage
- 1,978
- Type of work
- Renovation/Alteration
- Scope
- Interior office fit-out within the existing shell office. Scope includes 1,978 square feet with framed gypsum walls, acoustic tiled ceilings, and carpet tile.
- Status
- Review Complete
- Design firm
- (214) 748-2000
- Location
- 2300 Chelsea Blvd, Collin County, Texas
- County
- Collin
- TDLR project
- DFW02 - DH 150
- Facility
- Stack DFW02
- Owner
- Stack Infrastructure
- Estimated cost
- $20,000,000
- Square footage
- 23,690
- Type of work
- Additions to Existing Building
- Scope
- 18,142 SF Data Hall and support spaces fit out of existing shell space
- Status
- Project Closed
- Location
- 6715 Pinecrest Drive, Collin County, Texas
- County
- Collin
- TDLR project
- CyrusOne Allen DH2 Fit Up
- Facility
- CyrusOne Allen Building 1
- Owner
- CyrusOne
- Estimated cost
- $50,000,000
- Square footage
- 82,750
- Type of work
- Additions to Existing Building
- Scope
- New phase of work on existing CyrusOne Allen campus in Bldg 1. Work will be fit up of existing shell space for new data hall & associated equipment galleries. Existing service yard to have new equipment & expansion to existing metal grate platform.
- Status
- Project Registered
- Design firm
- (214) 757-1713
- Location
- 2300 Chelsea Blvd., Collin County, Texas
- County
- Collin
- TDLR project
- Corgan Frisco
- Facility
- Frisco Square - Building C1
- Owner
- Maxus Properties LLC
- Estimated cost
- $250,000
- Square footage
- 4,147
- Type of work
- Renovation/Alteration
- Scope
- Tenant Finish-Out. New plumbing, millwork, electrical, and finishes. Includes a data center with supplemental air & power.
- Status
- Review Complete
- Design firm
- 214 757 1616
- Location
- 6175 Main Street, Suite 260, Collin County, Texas
- County
- Collin
- TDLR project
- EVERBROOK ACADEMY - MURHPY, TX
- Facility
- EVERBROOK ACADEMY - MURHPY, TX
- Owner
- RED APPLE JV LLC
- Estimated cost
- $4,049,391
- Square footage
- 11,548
- Type of work
- New Construction
- Scope
- ONE-STORY WOOD FRAMED CHILD LEARNING CENTER W/HIPPED AND GABLED ROOFS, CMU/CONCRETE FOUNDATIONS, COMPLETE INTERIOR AND FINISH PACKAGE, SITEWORK W/PLAYGROUND AREAS, FENCING, GATING, LANDSCAPING AND PARKING AREAS
- Status
- Project Closed
- Design firm
- (817) 705-3387
- Location
- 515 E FM 544, Collin County, Texas
- County
- Collin
- TDLR project
- Local Good Resale
- Facility
- Apple Square Retail Center
- Owner
- L.B. Showalter
- Estimated cost
- $200,000
- Square footage
- 4,061
- Type of work
- Renovation/Alteration
- Scope
- 4061 SF lease space; demolition as required to create display area and added inventory area. Existing restrooms are to be demolished and new restrooms constructed.
- Status
- Project Closed
- Design firm
- 214-766-3030
- Location
- 2201 K. Avenue, Suite D-100, Collin County, Texas
- County
- Collin
- TDLR project
- 25142 - CS Richardson - DC5
- Facility
- Charles Schwab DC5
- Owner
- Charles Schwab
- Estimated cost
- $730,007
- Square footage
- 116,091
- Type of work
- Renovation/Alteration
- Scope
- Minor construction of a Type II commercial data center.
- Status
- Review Complete
- Design firm
- (817) 430-3382
- Location
- 1811 Renner Rd., Collin County, Texas
- County
- Collin
- TDLR project
- Data Hall 7
- Facility
- T5@Dallas
- Owner
- 394 Pacific DCD, LLC (Rick Waddle)
- Estimated cost
- $3,900,000
- Square footage
- 12,500
- Type of work
- Renovation/Alteration
- Scope
- Population of equipment and infrastructure needed to support the equipment including cable tray and raised access flooring support
- Status
- Review Complete
- Design firm
- (214) 757-1780
- Location
- 6653 Pinecrest Dr, Collin County, Texas
- County
- Collin
- TDLR project
- NRI-ITSA
- Facility
- Frisco Station - The Offices One
- Owner
- Metlife Core Property REIT, LLC
- Estimated cost
- $450,000
- Square footage
- 5,823
- Type of work
- Renovation/Alteration
- Scope
- Consists of a data operations room, conference room, it room, security access points, raised floor, and relocated finishes and fixtures
- Status
- Project Closed
- Design firm
- (469) 872-5159
- Location
- 6160 Warren Parkway, Collin County, Texas
- County
- Collin
- TDLR project
- NTTA Plano Operations Center Fleet Service Building Expansion & HVAC Upgrades
- Facility
- Plano Operations Center
- Owner
- North Texas Tollway Authority
- Estimated cost
- $7,400,000
- Square footage
- 5,009
- Type of work
- Additions to Existing Building
- Scope
- Building addition to include expansion of the existing auto maintenance bays, a fleet service office and a campus wide backup generator. Mechanical and electrical modifications throughout the building. Miscellaneous interior alterations throughout.
- Status
- Project Closed
- Design firm
- (214) 818-0563
- Location
- 1080 Ohio Drive, Collin County, Texas
- County
- Collin
- TDLR project
- BAC WTX Wyndham Road Restroom Renovation
- Facility
- Bank of America WTX Wyndham Road
- Owner
- Bank of America
- Estimated cost
- $800,000
- Square footage
- 600
- Type of work
- Renovation/Alteration
- Scope
- Restroom renovation an existing Bank of America Data center location. The renovation is approximately 600sf for one of the men's and women's restrooms in the facility.
- Status
- Review Complete
- Design firm
- 214.273.1500
- Location
- 3510 Wyndham Lane, Collin County, Texas
- County
- Collin
- TDLR project
- Koala - Fit Up Phase 3
- Facility
- Coit Road Data Center
- Owner
- Lincoln Property Company
- Estimated cost
- $136,000,000
- Square footage
- 9,419
- Type of work
- Renovation/Alteration
- Scope
- Data Center Fit Up of existing shell space, 9,419 sf total, within the Coit Road Data Center including supporting infrastructure and site improvements.
- Status
- Project Registered
- Design firm
- 214-842-6183
- Location
- 1000 Coit Rd, Collin County, Texas
- County
- Collin
- TDLR project
- PNC Bank ADA Remediation Design - Independence Pkwy
- Facility
- E680 Plano Independence Pkwy
- Owner
- Compass Bank Plaza
- Estimated cost
- $320,000
- Square footage
- 18,420
- Type of work
- Renovation/Alteration
- Scope
- The improvements intend to bring the facility exterior accessible parking/access aisle and accessible pedestrian paths into compliance with current ADA standards.
- Status
- Review Complete
- Design firm
- (412) 269-6300
- Location
- 1420 Independence Pkwy, Collin County, Texas
- County
- Collin
- TDLR project
- DDX6 Amazon Frisco
- Facility
- DDX6 Amazon
- Owner
- Business Park AMZ LLC Star
- Estimated cost
- $79,154
- Square footage
- 400
- Type of work
- Renovation/Alteration
- Scope
- install and anchoring of additional Maintenance Access Platforms to an existing conveyance system located within an existing warehouse
- Status
- Review Complete
- Location
- 16399 Gateway Path, Collin County, Texas
- County
- Collin
- TDLR project
- Frisco Container Project
- Facility
- Frisco Container Project
- Owner
- City of Frisco
- Estimated cost
- $2,750,000
- Square footage
- 4,800
- Type of work
- New Construction
- Scope
- Project located at existing City of Frisco Fire Station #9 and Training Center. New construction of a Concrete Data Center Structure, CMU Storage Building and Fuel Island along with associated site development.
- Status
- Project Closed
- Design firm
- 714-381-6673
- Location
- 15151 Donnie Mayfield Way 15155 Donnie Mayfield Way, Collin County, Texas
- County
- Collin
- TDLR project
- Flexential Plano
- Facility
- Flexential
- Owner
- Flxential
- Estimated cost
- $400,000
- Square footage
- 6,401
- Type of work
- Renovation/Alteration
- Scope
- Project is a minor renovation of (3) existing suites to add new offices, new conference rooms, and (2) new break rooms.
- Status
- Project Registered
- Design firm
- (720) 515-5584
- Location
- 3500 E Plano Parkway, Collin County, Texas
- County
- Collin
- TDLR project
- CyrusOne Allen B1 - Conference & Breakroom
- Facility
- CyrusOne Allen Building 1
- Owner
- Cyrus One (Andrew Ford)
- Estimated cost
- $250,000
- Square footage
- 1,460
- Type of work
- Renovation/Alteration
- Scope
- Interior fit out of Break room, Conference room and segment of corridor.
- Status
- Project Closed
- Design firm
- 214-748-2000
- Location
- 2300 Chelsea Blvd, Collin County, Texas
- County
- Collin
- TDLR project
- ECSS 2.103 & 2.104 Renovation
- Facility
- Engineering & Computer Science South
- Owner
- Univ of Tex at Dallas
- Estimated cost
- $420,000
- Square footage
- 5,247
- Type of work
- Renovation/Alteration
- Scope
- Repurposing an existing student computer lab to create a new classroom space that can be subdivided into three separate classrooms using two Modernfold partition doors and repurposing an existing lab server room into an office space.
- Status
- Inspection Complete
- Design firm
- (214) 923-6136
- Location
- 800 W Campbell Rd Building designator "ECSS", Collin County, Texas
- County
- Collin
- TDLR project
- DA7 FLEX SPACE
- Facility
- EQUINIX
- Owner
- STACK INFRASTRUCTURE
- Estimated cost
- $130,000
- Square footage
- 786
- Type of work
- Renovation/Alteration
- Scope
- FINISHES, DROP CEILING, ELEC OUTLETS AND LIGHTS. NO ARCHITECTURAL, SOME DUCT WORK
- Status
- Inspection Complete
- Design firm
- 469-428-0116
- Location
- 6653 PINE CREST, Collin County, Texas
- County
- Collin
- TDLR project
- McKinney Fire Dept. HQ
- Facility
- Fire Station #2
- Owner
- City of McKinney
- Estimated cost
- $9,500,000
- Square footage
- 16,503
- Type of work
- New Construction
- Scope
- A 16,503 SF NEW CONTRUCTION OF A FIRE STATION WITH LARGE OUTDOOR COVERED PATIO AREA AND EMERGENCY GENERATOR. THIS BUILDING IS ONE OF THREE ON THE LOT.
- Status
- Inspection Complete
- Design firm
- (214) 273-1500
- Location
- 2104 Taylor-Burk Dr., Collin County, Texas
- County
- Collin
- TDLR project
- CyrusOne Allen Load Adder
- Facility
- CyrusOne Allen Building 1
- Owner
- C1 Dallas-Allen (Lot 1) LLC
- Estimated cost
- $41,500,000
- Square footage
- 80,620
- Type of work
- Additions to Existing Building
- Scope
- A new phase of work on the existing CyrusOne Allen Campus in Bldg 1. Work will be an addition to an existing data hall. New equipment will be added to the service yards, mechanical galleries, pdu gallery and data hall.
- Status
- Project Registered
- Design firm
- (214) 757-1713
- Location
- 2300 Chelsea Blvd, Collin County, Texas
- County
- Collin
- TDLR project
- Flexential Plano Battery Replacement
- Facility
- Flexential Data Center
- Owner
- FLEXENTIAL CORP
- Estimated cost
- $2,990,000
- Square footage
- 2,000
- Type of work
- Renovation/Alteration
- Scope
- Replace existing Energy Storage System with new
- Status
- Project Registered
- Design firm
- 303.839.2999
- Location
- 3500 East Plano Parkway, Collin County, Texas
- County
- Collin
- TDLR project
- BOOT BARN #366
- Facility
- CRAIG CROSSING SHOPPING CENTER
- Owner
- CENTCOM/VANTAGE MCKINNEY LLC
- Estimated cost
- $250,000
- Square footage
- 15,000
- Type of work
- Renovation/Alteration
- Scope
- TENANT INTERIOR FINISH TO INCLUDE NEW WALLS, FINISHES, FIXTURES, AND PAINT
- Status
- Inspection Complete
- Design firm
- (314) 415-2400
- Location
- 3190 S CENTRAL EXPRESSWAY SUITE 300, Collin County, Texas
- County
- Collin
- TDLR project
- Lewco: Gateway Dr (16399) Site DDX6 Permit
- Facility
- Amazon DDX6
- Owner
- Star Business Park LLC
- Estimated cost
- $3,392,618
- Square footage
- 105,364
- Type of work
- Renovation/Alteration
- Scope
- NO CHANGE IN USE, EGRESS, OR OCCUPANCY. INTERIOR WORK ONLY. RELOCATE EXISTING CONVEYORS INSTALL NEW CONVEYORS INSTALL NEW COMPRESSOR SYSTEM INSTALL INTERIOR SAFETY FENCE INSTALL ELECTRICAL FOR CONVEYORS CONVEYORS = 253'-0" LINEAR FEET
- Status
- Project Registered
- Location
- 16399 Gateway Dr, Collin County, Texas
- County
- Collin
- TDLR project
- CoreWeave Plano
- Facility
- Flexential Data Center Hall
- Owner
- Legacy Investing
- Estimated cost
- $11,000,000
- Square footage
- 75,000
- Type of work
- Renovation/Alteration
- Scope
- New installation of electrical conduits & receptacles to service new data racks within existing data center room. No hard construction or new partitions. Existing ceiling and lighting to remain. No change in use. Area of work approx. 75K SF
- Status
- Project Registered
- Design firm
- (214) 747-2511
- Location
- 3500 E Plano Parkway, Collin County, Texas
- County
- Collin
- TDLR project
- Fidelity
- Facility
- Legacy Town Center II
- Owner
- KBSiii Legacy Town Center LLC
- Estimated cost
- $160,000
- Square footage
- 4,853
- Type of work
- Renovation/Alteration
- Scope
- 4,853 SF of tenant improvement.
- Status
- Project Closed
- Design firm
- (972) 770-2222
- Location
- 6900 Dallas Parkway, Suite 610, Collin County, Texas
- County
- Collin
- TDLR project
- Amazon Fulfillment Center STX8 - QTX1 Ground PADDC
- Facility
- Amazon Fulfillment Center STX8
- Owner
- Clarion Partners
- Estimated cost
- $500,000
- Square footage
- 9,400
- Type of work
- New Construction
- Scope
- New Construction (located in parking lot of existing STX8 site). Perimeter fencing around 2 modular structures. Striping on existing pavement within fenced area for accessible circulation and launch / landing pads for delivery system
- Status
- Review Complete
- Design firm
- (412) 806-8051
- Location
- 3051 Research Dr., Collin County, Texas
- County
- Collin
- TDLR project
- North Dallas Veterinary Specialty Hospital
- Facility
- Emergency Animal Hospital of Collin County - West
- Owner
- Larsoni Management Corporation
- Estimated cost
- $1,700,000
- Square footage
- 8,504
- Type of work
- Renovation/Alteration
- Scope
- Demolition of existing interior space of an existing building and construction of new veterinary hospital. Minor site improvements of outdoor dog walk area and emergency generator.
- Status
- Project Closed
- Design firm
- (512) 531-9075
- Location
- 18020 Dallas Parkway, Collin County, Texas
- County
- Collin
- TDLR project
- DFW04-2
- Facility
- DFW04-2
- Owner
- Aligned Data Centers
- Estimated cost
- $120,000,000
- Square footage
- 190,550
- Type of work
- Renovation/Alteration
- Scope
- Tenant fit out of data hall space.
- Status
- Project Registered
- Design firm
- 214-757-1728
- Location
- 601 North Star Rd., Collin County, Texas
- County
- Collin
- TDLR project
- Cyrusne DFW4 | Shell & Upfit
- Facility
- DFW4
- Owner
- CyrusOne
- Estimated cost
- $31,500,000
- Square footage
- 126,005
- Type of work
- New Construction
- Scope
- New Construction, single-story Data Center with two-story office component. Total SF expected to be 126,005. Exterior construction to be insulated precast with steel structure.
- Status
- Review Complete
- Design firm
- 817-929-6997
- Location
- Chelsea Blvd., Collin County, Texas
- County
- Collin
- TDLR project
- Evoque Data Center Pavement Repair
- Facility
- Evoque Data Center
- Owner
- 900 Guardians Way LLC, a Delaware limited liability company
- Estimated cost
- $450,000
- Square footage
- 15,000
- Type of work
- Renovation/Alteration
- Scope
- Pavement repair for existing drive and fire lane.
- Status
- Project Closed
- Design firm
- (214) 739-8100
- Location
- 900 Guardians Way, Collin County, Texas
- County
- Collin
- TDLR project
- UTD Tradecraft Coffee & Co at JSOM
- Facility
- University of Texas at Dallas, NAVEEN JINDAL SCHOOL OF MANAGEMENT BUILDING
- Owner
- University of Texas at Dallas
- Estimated cost
- $170,000
- Square footage
- 611
- Type of work
- Renovation/Alteration
- Scope
- THE SCOPE OF THIS PROJECT IS A NON-STRUCTURAL INTERIOR FINISH-OUT IN AN EXISTING SUITE FOR COMPASS GROUP/CHARTWELLS. SCOPE INCLUDES ELECTRICAL AND PLUMBING.
- Status
- Project Closed
- Design firm
- (214) 638-6800
- Location
- 800 West Campbell Rd. JSOM, Suite 11.120, Collin County, Texas
- County
- Collin
- TDLR project
- Main Lobby & Office Upgrades RTX
- Facility
- Bank of America Data Center
- Owner
- NationsBanc Corporate Center
- Estimated cost
- $919,237
- Square footage
- 2,000
- Type of work
- Renovation/Alteration
- Scope
- Main Lobby modifications adding new interior security doors and additional exterior door. Office renovation adding four private offices
- Status
- Project Registered
- Design firm
- (913) 244-9166
- Location
- 3000 Telcom Parkway, Collin County, Texas
- County
- Collin
- TDLR project
- Video Productions
- Facility
- Globe Life
- Owner
- United American Insurance Corporation
- Estimated cost
- $150,000
- Square footage
- 3,000
- Type of work
- Renovation/Alteration
- Scope
- Interior fit out of existing data center space into recording studio.
- Status
- Project Closed
- Design firm
- (972) 233-0400
- Location
- 3700 S Stonebridge Drive, Collin County, Texas
- County
- Collin
- TDLR project
- RM C1N SCC
- Facility
- RAYTHEON MCKINNEY
- Owner
- RAYTHEON
- Estimated cost
- $150,000
- Square footage
- 1,800
- Type of work
- Renovation/Alteration
- Scope
- Renovation of existing server room and exterior condenser yard.
- Status
- Project Closed
- Design firm
- (469) 941-0431
- Location
- 2501 W. UNIVERSITY DR., Collin County, Texas
- County
- Collin
- TDLR project
- USTX02 - UPS 5A & 5B
- Facility
- Bank of America Data Center
- Owner
- Bank of America
- Estimated cost
- $14,200,000
- Square footage
- 11,500
- Type of work
- Renovation/Alteration
- Scope
- Removal of existing liquid cell batteries, replacement of UPS equipment and new ion lithium battery systems
- Status
- Project Closed
- Design firm
- (913) 244-9166
- Location
- 3510 Wyndham Lane, Collin County, Texas
- County
- Collin
- TDLR project
- Aligned Lobby Mantrap
- Facility
- Aligned Data Cetner
- Owner
- Aligned Data Centers
- Estimated cost
- $350,000
- Square footage
- 250
- Type of work
- Renovation/Alteration
- Scope
- Replacement of existing lobby mantrap system
- Status
- Project Registered
- Design firm
- (214) 969-5599
- Location
- 2800 Summit Avenue, Collin County, Texas
- County
- Collin
- TDLR project
- Unicom Phase 1
- Facility
- Unicom
- Owner
- C/O DRA ADVISORS LLC
- Estimated cost
- $50,000
- Square footage
- 1,000
- Type of work
- Renovation/Alteration
- Scope
- Addition of cooling tower, tanks, and infill of existing window opening.
- Status
- Review Complete
- Location
- 3501 E Plano Pkwy, Collin County, Texas
- County
- Collin
- TDLR project
- Aligned DFW02 Expansion
- Facility
- DFW02
- Owner
- Aligned Data Centers
- Estimated cost
- $154,300,000
- Square footage
- 226,610
- Type of work
- New Construction
- Scope
- A new Data Center with 188,480SF of Data Hall space on two floors and 38, 130SF of Office space on three floors. The new building is located on a 19 acre site, adjacent to an existing single story Data Center with shared loading dock facilities.
- Status
- Review Complete
- Design firm
- (214) 969-5599
- Location
- 2800 Summit Ave., Collin County, Texas
- County
- Collin
- TDLR project
- Hui Lau Shan
- Facility
- Frisco Ranch Tract 2
- Owner
- New Quest
- Estimated cost
- $100,000
- Square footage
- 1,418
- Type of work
- Renovation/Alteration
- Scope
- This is a 1,418sf desert store finish out project
- Status
- Project Closed
- Design firm
- (504) 400-3806
- Location
- 9180 Warren Parkway Unit 137, Collin County, Texas
- County
- Collin
- TDLR project
- CyrusOne Allen Tenant Office Fitout
- Facility
- Cyrus One
- Owner
- CyrusOne
- Estimated cost
- $300,000
- Square footage
- 1,623
- Type of work
- Renovation/Alteration
- Scope
- Small interior tenant finish-out. Open office and conference room suite in Data Center.
- Status
- Project Registered
- Design firm
- 214-757-1835
- Location
- 2300 Chelsea Blvd, Collin County, Texas
- County
- Collin
- TDLR project
- Green Apple Mediterranean Cuisine
- Facility
- Preston @ Wade Crossing
- Owner
- Ramjay Assets LLC
- Estimated cost
- $238,358
- Square footage
- 2,195
- Type of work
- Additions to Existing Building
- Scope
- New Restaurant Finish-Out
- Status
- Project Closed
- Design firm
- 214-223-4501
- Location
- 5855 Preston Road, Collin County, Texas
- County
- Collin
- TDLR project
- Target#1763 Frisco, TX - Pomme
- Facility
- Target Corporation
- Owner
- Target Corporation
- Estimated cost
- $310,000
- Square footage
- 3,392
- Type of work
- Renovation/Alteration
- Scope
- Adding in an Apple Display Unit. Includes adding and relocating fixtures, updating wall/floor finish, and power and lighting updates. No change to occupancy, use, life safety, or egress.
- Status
- Project Closed
- Design firm
- 651-285-8174
- Location
- 3201 Preston Rd, Collin County, Texas
- County
- Collin
- TDLR project
- Evocative DAL6 Infrastructure Upgrades
- Facility
- Evocative Data Center DAL6
- Owner
- Mapletree
- Estimated cost
- $30,000,000
- Square footage
- 200,000
- Type of work
- Renovation/Alteration
- Scope
- Mechanical and Electrical equipment replacements and additions including chillers, generators, UPS systems and electrical distribution. Scope is detailed on Burns Engineering Drawings DAL6 Infrastructure Upgrades dated 7/2/25
- Status
- Project Registered
- Design firm
- (512) 534-9291
- Location
- 1221 Coit Road, Collin County, Texas
- County
- Collin
- TDLR project
- USTX02 - WTX Control Room
- Facility
- Bank of America - Data Center
- Owner
- FIA Card Services
- Estimated cost
- $3,000,000
- Square footage
- 1,890
- Type of work
- Renovation/Alteration
- Scope
- Modification of existing open space for use as Control Room facility and addition of Archive Storage Room
- Status
- Review Complete
- Design firm
- (913) 244-9166
- Location
- 3510 Wyndham Lane, Collin County, Texas
- County
- Collin
- Queue capacity (Other)
- 1,180.54 MW
- Approximate location — county level.
Water records
Full water records (public feeds)
- Groundwater conservation district
- NORTH TEXAS GROUNDWATER CONSERVATION DISTRICT
- Groundwater conservation district
- Not determined.
Politics records
- School district
- Allen Independent School District
- Students
- 21,370
- Assessed value
- $26,885,480,286
- School district
- Frisco Independent School District
- Students
- 66,698
- Assessed value
- $78,992,594,292
- School district
- McKinney Independent School District
- Students
- 23,306
- Assessed value
- $34,045,627,667
- School district
- Plano Independent School District
- Students
- 47,899
- Assessed value
- $90,924,312,329
- School district
- Prosper Independent School District
- Students
- 28,467
- Assessed value
- $28,428,960,940
- State House
- District 33 — Katrina Pierson (R)
- State House
- District 61 — Keresa Richardson (R)
- State House
- District 66 — Matt Shaheen (R)
- State House
- District 67 — Jeff Leach (R)
- State House
- District 70 — Mihaela Plesa (D)
- State House
- District 89 — Candy Noble (R)
- State Senate
- District 2 — Bob Hall (R)
- State Senate
- District 8 — Angela Paxton (R)
- State Senate
- District 30 — Brent Hagenbuch (R)
- Congressional
- District 3 — Keith Self (R)
- Congressional
- District 4 — Pat Fallon (R)
- Congressional
- District 32 — Julie Johnson (D)
- Top taxpayers
- Subscribe to see
- M&O collections
- Subscribe to see
- Per-student spend
- Subscribe to see
- Median household income
- Subscribe to see
- Top industries
- Subscribe to see
- Population
- Subscribe to see
- School-district economics (annual) are shown for McKinney Independent School District (most cert sites); 4 other districts on record.
Sources: Texas Geographic Information Office · Texas Comptroller · Texas Department of Licensing and Regulation · Texas Water Development Board · ERCOT
Frequently asked questions
How many data center projects does Collin County have in public records?
Collin County has 10 Comptroller-certified data-center sites and 61 TDLR construction filings in the public feeds this atlas tracks.
What is the largest TDLR data-center filing cost on record in Collin County?
DFW04 lists an estimated cost of $161,000,000 in TDLR public records for Collin County.
Which groundwater districts appear at known Collin County data-center sites?
Public records for known project locations name NORTH TEXAS GROUNDWATER CONSERVATION DISTRICT. District boundaries do not follow county lines, so this is point-derived, not whole-county coverage.
Annual subscriber data
Collin County — locked fields
The free brief and map above name public projects and county-level jurisdictions. Annual access unlocks who governs a specific pin on the map and fills the tax-base fields below.
School district
- Top taxpayersAnnual
- M&O collectionsAnnual
- Per-student spendAnnual
County
- Median household incomeAnnual
- Top industriesAnnual
- PopulationAnnual
Subscribe annually for pin-level jurisdictions on the county map (who governs a specific site) plus school-district tax-base fields (top taxpayers, M&O, per-pupil)
View annual plans