Data Centers in Wharton County
Under constructionWharton County hosts 12 Comptroller-certified sites and 12 TDLR construction filings Projects touch 1 school district (El Campo Independent School District). U.S. House seats in the record: District 22. Free brief: power, water, and politics from those records. Annual unlocks school-district tax-base fields (top taxpayers, M&O, per-pupil) and who governs a specific pin on the map.
Power
Wharton County power records from Comptroller certificates and TDLR filings. Certified names in the public record include Gulf Horizon Data Center, Cipher Black Pearl LLC Data Center, Cinco Data Center, Spectrum Data Center, NTT Global Data Centers Americas - Dallas TX2, ALE60 Data Center, NTT Global Data Centers Americas - Dallas TX4, ALE61 Data Center, and 4 more. TDLR project names include PROJECT EAGLE - BUILDING B, Project Eagle, PROJECT EAGLE - BUILDING C, Prairie Switch, Project Eagle, Project Eagle, and 6 more. PROJECT EAGLE - BUILDING B lists an estimated cost of $300,000,000. Nearby ERCOT queue capacity summarized by fuel includes 4,227 MW Solar; 2,666 MW Other; 1,452 MW Gas. Approximate sites stay county-level when geocode quality does not support a precise city.
Water
Water at project locations (not whole-county coverage). Known sites name COASTAL BEND GROUNDWATER CONSERVATION DISTRICT. District boundaries do not follow county lines.
Politics
Wharton County siting records (not a full voter guide). School districts appearing on certified or filed sites include El Campo Independent School District. U.S. House districts in the record: District 22 — Troy Nehls (R). State House: District 85 — Stan Kitzman (R). State Senate: District 17 — Joan Huffman (R). Tax-base fields (top taxpayers, M&O, per-pupil) stay annual-only. Pin-level “who governs this parcel” is annual on the map.
Loading map…
Power records
Full power records (public feeds)
- Certified site
- Gulf Horizon Data Center
- Occupant
- Amazon Data Services, Inc.
- Certificate type
- large
- Nearest city
- El Campo
- Certified site
- Cipher Black Pearl LLC Data Center
- Occupant
- Amazon Data Services, Inc.
- Certificate type
- large
- Nearest city
- El Campo
- Certified site
- Cinco Data Center
- Occupant
- Design LLC
- Certificate type
- large
- Nearest city
- El Campo
- Certified site
- Spectrum Data Center
- Occupant
- Amazon Data Services, Inc.
- Certificate type
- large
- Nearest city
- El Campo
- Certified site
- NTT Global Data Centers Americas - Dallas TX2
- Occupant
- Amazon Data Services, Inc.
- Certificate type
- qualifying
- Nearest city
- El Campo
- Certified site
- ALE60 Data Center
- Occupant
- Amazon Data Services Inc.
- Certificate type
- qualifying
- Nearest city
- El Campo
- Certified site
- NTT Global Data Centers Americas - Dallas TX4
- Occupant
- Amazon Data Services, Inc.
- Certificate type
- qualifying
- Nearest city
- El Campo
- Certified site
- ALE61 Data Center
- Occupant
- Amazon Data Services Inc.
- Certificate type
- qualifying
- Nearest city
- El Campo
- Certified site
- NTT Global Data Centers Americas - Dallas TX3
- Occupant
- Amazon Data Services, Inc.
- Certificate type
- qualifying
- Nearest city
- El Campo
- Certified site
- Bexar 1
- Occupant
- Amazon Data Services, Inc.
- Certificate type
- qualifying
- Nearest city
- El Campo
- Certified site
- ALE62 Data Center
- Occupant
- Amazon Data Services Inc.
- Certificate type
- qualifying
- Nearest city
- El Campo
- Certified site
- Stingray
- Occupant
- Amazon Data Services, Inc.
- Certificate type
- qualifying
- Nearest city
- El Campo
- TDLR project
- PROJECT EAGLE - BUILDING B
- Facility
- Data Center
- Owner
- AMAZON DATA SERVICES, INC
- Estimated cost
- $300,000,000
- Square footage
- 189,060
- Type of work
- New Construction
- Scope
- New data center building
- Status
- Project Registered
- Design firm
- (713) 844-0000
- Location
- 258 Eaglewood Rd, Wharton County, Texas
- County
- Wharton
- TDLR project
- Project Eagle
- Facility
- Building G
- Owner
- AMAZON DATA SERVICES, INC
- Estimated cost
- $300,000,000
- Square footage
- 189,060
- Type of work
- New Construction
- Scope
- Data center
- Status
- Project Registered
- Design firm
- (713) 844-0000
- Location
- 230 Eaglewood, Wharton County, Texas
- County
- Wharton
- TDLR project
- PROJECT EAGLE - BUILDING C
- Facility
- Data Center
- Owner
- AMAZON DATA SERVICES, INC
- Estimated cost
- $300,000,000
- Square footage
- 189,060
- Type of work
- New Construction
- Scope
- New data center building
- Status
- Project Registered
- Design firm
- (713) 844-0000
- Location
- 240 Eaglewood Rd, Wharton County, Texas
- County
- Wharton
- TDLR project
- Prairie Switch
- Facility
- Operations & Maintenance Building
- Owner
- Prairie Switch Wind LLC
- Estimated cost
- $1,350,000
- Square footage
- 5,000
- Type of work
- New Construction
- Scope
- Ground up construction of pre-engineered metal building used for office and shop.
- Status
- Project Closed
- Design firm
- (832) 299-4844
- Location
- 6445 CR 421, Wharton County, Texas
- County
- Wharton
- TDLR project
- Project Eagle
- Facility
- Building F
- Owner
- AMAZON DATA SERVICES, INC
- Estimated cost
- $300,000,000
- Square footage
- 189,060
- Type of work
- New Construction
- Scope
- Data center
- Status
- Project Registered
- Design firm
- (713) 844-0000
- Location
- 270 Eaglewood Rd, Wharton County, Texas
- County
- Wharton
- TDLR project
- Project Eagle
- Facility
- Building H
- Owner
- AMAZON DATA SERVICES, INC
- Estimated cost
- $300,000,000
- Square footage
- 189,060
- Type of work
- New Construction
- Scope
- Data center
- Status
- Project Registered
- Design firm
- (713) 844-0000
- Location
- 234 Eaglewood Rd, Wharton County, Texas
- County
- Wharton
- TDLR project
- Project Eagle
- Facility
- Building E
- Owner
- AMAZON DATA SERVICES, INC
- Estimated cost
- $300,000,000
- Square footage
- 189,060
- Type of work
- New Construction
- Scope
- Data center
- Status
- Project Registered
- Design firm
- (713) 844-0000
- Location
- 266 Eaglewood Dr, Wharton County, Texas
- County
- Wharton
- TDLR project
- PROJECT EAGLE - BUILDING D
- Facility
- Data Center
- Owner
- AMAZON DATA SERVICES, INC
- Estimated cost
- $300,000,000
- Square footage
- 189,060
- Type of work
- New Construction
- Scope
- new data center building
- Status
- Project Registered
- Design firm
- (713) 844-0000
- Location
- 244 Eaglewood Rd, Wharton County, Texas
- County
- Wharton
- TDLR project
- PROJECT EAGLE - BUILDING A
- Facility
- Data Center
- Owner
- AMAZON DATA SERVICES, INC
- Estimated cost
- $300,000,000
- Square footage
- 189,060
- Type of work
- New Construction
- Scope
- New data center building
- Status
- Project Registered
- Design firm
- (713) 844-0000
- Location
- 244 Eaglewood Rd, Wharton County, Texas
- County
- Wharton
- TDLR project
- Project Eagle
- Facility
- Building J
- Owner
- AMAZON DATA SERVICES, INC
- Estimated cost
- $300,000,000
- Square footage
- 189,060
- Type of work
- New Construction
- Scope
- Data center
- Status
- Project Registered
- Design firm
- (713) 844-0000
- Location
- 237 Eaglewood Dr, Wharton County, Texas
- County
- Wharton
- TDLR project
- Project Eagle
- Facility
- Building K
- Owner
- AMAZON DATA SERVICES, INC
- Estimated cost
- $300,000,000
- Square footage
- 189,060
- Type of work
- New Construction
- Scope
- data center
- Status
- Project Registered
- Design firm
- (713) 844-0000
- Location
- 233 Eaglewod Rd, Wharton County, Texas
- County
- Wharton
- TDLR project
- Project Eagle Building M
- Facility
- Auxiliary Water Building
- Owner
- AMAZON DATA SERVICES, INC
- Estimated cost
- $2,000,000
- Square footage
- 4,067
- Type of work
- New Construction
- Scope
- New water building
- Status
- Project Registered
- Design firm
- (713) 844-0000
- Location
- 248 Eaglewod Rd, Wharton County, Texas
- County
- Wharton
- Queue capacity (Gas)
- 1,452.1 MW
- Queue capacity (Other)
- 2,666.09 MW
- Queue capacity (Solar)
- 4,227.37 MW
- Queue capacity (Wind)
- 199.5 MW
Water records
Full water records (public feeds)
- Groundwater conservation district
- COASTAL BEND GROUNDWATER CONSERVATION DISTRICT
Politics records
- School district
- El Campo Independent School District
- Students
- 3,326
- Assessed value
- $2,303,439,302
- State House
- District 85 — Stan Kitzman (R)
- State Senate
- District 17 — Joan Huffman (R)
- Congressional
- District 22 — Troy Nehls (R)
- Top taxpayers
- Subscribe to see
- M&O collections
- Subscribe to see
- Per-student spend
- Subscribe to see
- Median household income
- Subscribe to see
- Top industries
- Subscribe to see
- Population
- Subscribe to see
Sources: Texas Geographic Information Office · Texas Comptroller · Texas Department of Licensing and Regulation · Texas Water Development Board · ERCOT
Frequently asked questions
How many data center projects does Wharton County have in public records?
Wharton County has 12 Comptroller-certified data-center sites and 12 TDLR construction filings in the public feeds this atlas tracks.
What is the largest TDLR data-center filing cost on record in Wharton County?
PROJECT EAGLE - BUILDING B lists an estimated cost of $300,000,000 in TDLR public records for Wharton County.
Which groundwater districts appear at known Wharton County data-center sites?
Public records for known project locations name COASTAL BEND GROUNDWATER CONSERVATION DISTRICT. District boundaries do not follow county lines, so this is point-derived, not whole-county coverage.
Annual subscriber data
Wharton County — locked fields
The free brief and map above name public projects and county-level jurisdictions. Annual access unlocks who governs a specific pin on the map and fills the tax-base fields below.
School district
- Top taxpayersAnnual
- M&O collectionsAnnual
- Per-student spendAnnual
County
- Median household incomeAnnual
- Top industriesAnnual
- PopulationAnnual
Subscribe annually for pin-level jurisdictions on the county map (who governs a specific site) plus school-district tax-base fields (top taxpayers, M&O, per-pupil)
View annual plans