Data Centers in Wheeler County
Under constructionWheeler County hosts 3 TDLR data-center construction filings Projects touch 1 school district (Fort Elliott Consolidated Independent School District). U.S. House seats in the record: District 13. Free brief: power, water, and politics from those records. Annual unlocks school-district tax-base fields (top taxpayers, M&O, per-pupil) and who governs a specific pin on the map.
Power
Wheeler County power records from Comptroller certificates and TDLR filings. TDLR project names include Project Pumpkin 1A, Project Pumpkin 3A, and Project Pumpkin 2A. Project Pumpkin 1A lists an estimated cost of $400,000,000. Nearby ERCOT queue capacity summarized by fuel includes 1,300 MW Gas. Approximate sites stay county-level when geocode quality does not support a precise city.
Water
Water at project locations (not whole-county coverage). Known sites name PANHANDLE GROUNDWATER CONSERVATION DISTRICT. District boundaries do not follow county lines.
Politics
Wheeler County siting records (not a full voter guide). School districts appearing on certified or filed sites include Fort Elliott Consolidated Independent School District. U.S. House districts in the record: District 13 — Ronny Jackson (R). State House: District 88 — Ken King (R). State Senate: District 28 — Charles Perry (R). Tax-base fields (top taxpayers, M&O, per-pupil) stay annual-only. Pin-level “who governs this parcel” is annual on the map.
Loading map…
Power records
Full power records (public feeds)
- TDLR project
- Project Pumpkin 1A
- Facility
- Data Center Building 1A
- Owner
- IP Meitner Land LLC
- Estimated cost
- $400,000,000
- Square footage
- 761,000
- Type of work
- New Construction
- Scope
- 1-story data center with associated central utility buildings.
- Status
- Project Registered
- Design firm
- (609) 791-7307
- Location
- 8810 Co. Rd. 21, Gray County, Texas
- County
- Wheeler
- TDLR project
- Project Pumpkin 3A
- Facility
- Data Center Building 3A
- Owner
- IP Meitner Land LLC
- Estimated cost
- $400,000,000
- Square footage
- 761,000
- Type of work
- New Construction
- Scope
- 1-story data center with associated central utility buildings
- Status
- Project Registered
- Design firm
- (609) 791-7307
- Location
- 8850 Co. Rd. 21, Gray County, Texas
- County
- Wheeler
- TDLR project
- Project Pumpkin 2A
- Facility
- Data Center Building 2A
- Owner
- IP Meitner Land LLC
- Estimated cost
- $400,000,000
- Square footage
- 761,000
- Type of work
- New Construction
- Scope
- 1-story data center with associated central utility buildings.
- Status
- Project Registered
- Design firm
- (609) 791-7307
- Location
- 8830 Co. Rd 21, Gray County, Texas
- County
- Wheeler
- Queue capacity (Gas)
- 1,300 MW
Water records
Full water records (public feeds)
- Groundwater conservation district
- PANHANDLE GROUNDWATER CONSERVATION DISTRICT
Politics records
- School district
- Fort Elliott Consolidated Independent School District
- Students
- 158
- Assessed value
- $839,035,931
- State House
- District 88 — Ken King (R)
- State Senate
- District 28 — Charles Perry (R)
- Congressional
- District 13 — Ronny Jackson (R)
- Top taxpayers
- Subscribe to see
- M&O collections
- Subscribe to see
- Per-student spend
- Subscribe to see
- Median household income
- Subscribe to see
- Top industries
- Subscribe to see
- Population
- Subscribe to see
Sources: Texas Geographic Information Office · Texas Department of Licensing and Regulation · Texas Water Development Board · ERCOT
Frequently asked questions
How many data center projects does Wheeler County have in public records?
Wheeler County has 3 TDLR construction filings in the public feeds this atlas tracks.
What is the largest TDLR data-center filing cost on record in Wheeler County?
Project Pumpkin 1A lists an estimated cost of $400,000,000 in TDLR public records for Wheeler County.
Which groundwater districts appear at known Wheeler County data-center sites?
Public records for known project locations name PANHANDLE GROUNDWATER CONSERVATION DISTRICT. District boundaries do not follow county lines, so this is point-derived, not whole-county coverage.
Annual subscriber data
Wheeler County — locked fields
The free brief and map above name public projects and county-level jurisdictions. Annual access unlocks who governs a specific pin on the map and fills the tax-base fields below.
School district
- Top taxpayersAnnual
- M&O collectionsAnnual
- Per-student spendAnnual
County
- Median household incomeAnnual
- Top industriesAnnual
- PopulationAnnual
Subscribe annually for pin-level jurisdictions on the county map (who governs a specific site) plus school-district tax-base fields (top taxpayers, M&O, per-pupil)
View annual plans