July 28, 2026
Post Security Before the Study, or Watch Your 2027 Slot Go to a Buildable ProjectGalaxy acquired ~500 acres in McGregor for a second Texas campus (after its 1.6 GW Helios site), starting at 74 MW with power targeted for 2028.
Companies
Galaxy Digital Holdings Inc. operates Bitcoin mining operations in Texas, including facilities that consume significant electrical power from the state's grid.
July 28, 2026
Post Security Before the Study, or Watch Your 2027 Slot Go to a Buildable ProjectGalaxy acquired ~500 acres in McGregor for a second Texas campus (after its 1.6 GW Helios site), starting at 74 MW with power targeted for 2028.
July 7, 2026
The Permian Gets Texas's First 765 kV Backbone, and CREZ Wrote the PlaybookGalaxy delivered Helios Phase I on schedule, 133 MW to CoreWeave, with 526 MW committed across three phases.
Agencies
ERCOT
2 co-occurrences
People
Greg Abbott
2 co-occurrences
Companies
CoreWeave
2 co-occurrences
Agencies
PUCT
2 co-occurrences
Companies
QTS
2 co-occurrences
People
Frank Maisano
1 co-occurrence
Places
Fort Worth, TX
1 co-occurrence
People
Jim Kerrigan
1 co-occurrence
Companies
ECL
1 co-occurrence
Places
San Marcos, TX
1 co-occurrence