People

Meredith McCall

I don't have reliable factual information about Meredith McCall's specific role in Texas datacenter infrastructure, energy, or policy to provide an accurate sentence without speculation.

Referenced in 1 briefingLast referenced: August 26, 2026

Mentions

August 26, 2026

Tranche Power Gates Blackstone's Three AI Factory Campuses

Meredith McCall, speaking for Little McMountain Ranch LLC and Walter McCullough, filed oral argument August 25 in PUCT Control No. 58317 challenging Need for dockets 59315 and 59029, Oncor Electric Delivery's 765 kV lines aimed at large load and oil and gas.

Frequently mentioned alongside