PJM's draft bars auto-transfer to backup on voltage counts alone when ride-through is expected, and Neil Osnato of Persistence Analytics Group put the stake cleanly: the reliability problem is whether the load behaves as the grid assumes once connected.
Neil Osnato of Persistence Analytics Group puts the underwriting point cleanly: identical megawatt labels can hide different energization timing, contingency performance, and stress reliability.
Neil Osnato of Persistence Analytics Group warned against summing the 2 GW gas and 2.6 GW battery into a claimed 4.6 GW of firm capacity: "A gigawatt of battery capacity is not the same thing as a gigawatt of continuously available generation."
Neil Osnato of Persistence Analytics Group flagged the open question: whether eligibility criteria can "distinguish submitted megawatts from financeable, buildable, and durable megawatts."
As Neil Osnato of Persistence Analytics Group put it, the first-order questions stay the same: can I get power, on my timeline, with durable operating cost?